As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of

image text in transcribedimage text in transcribed

As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base 2 springs, and 3 clamps. The base is assembled from 2 clamps and 1 housing. Each clamp has 1 handle and 2 castings. Each housing has 1 bearing and 1 shaft. There is no inventory on hand. a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item. b) Determine the gross quantities needed of each item if you are to assemble 150 brackets. b) Determine the gross quantities needed of each item if you are to assemble 150 brackets. Click the icon to view the completed product structure. Base: units (enter your response as a whole number). Spring: units (enter your response as a whole number). Clamp: units (enter your response as a whole number). Housing: units (enter your response as a whole number). Handle: units (enter your response as a whole number). Casting: units (enter your response as a whole number). Bearing: units (enter your response as a whole number). Shaft: units (enter your response as a whole number). As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base 2 springs, and 3 clamps. The base is assembled from 2 clamps and 1 housing. Each clamp has 1 handle and 2 castings. Each housing has 1 bearing and 1 shaft. There is no inventory on hand. a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item. b) Determine the gross quantities needed of each item if you are to assemble 150 brackets. b) Determine the gross quantities needed of each item if you are to assemble 150 brackets. Click the icon to view the completed product structure. Base: units (enter your response as a whole number). Spring: units (enter your response as a whole number). Clamp: units (enter your response as a whole number). Housing: units (enter your response as a whole number). Handle: units (enter your response as a whole number). Casting: units (enter your response as a whole number). Bearing: units (enter your response as a whole number). Shaft: units (enter your response as a whole number)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Strategic Management Theory and Cases An Integrated Approach

Authors: Charles W. L. Hill

12th edition

1305502272, 1305502277, 978-1305502338

More Books

Students also viewed these General Management questions

Question

What is the National Alliance of Business?

Answered: 1 week ago

Question

What are the two broad types of original research?

Answered: 1 week ago