As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, springs and clamps. The base is assembled from clamp and housings. Each clamp has handle and casting. Each housing has bearings and shaft. There is no inventory on hand.
LOADING... Click the icon to view the product structure.
Part
Your boss at Xiangling Hu Products, Inc., has just provided you with the schedule and lead times for the bracket. The unit is to be prepared in week The lead times for the components are bracket week base week spring week clamp week housing weeks handle week casting weeks bearing week and shaft week
Part
a Choose the correct timephased product structure for the bracket.
A
Time in weeks
Horizontal line labeled Time in weeks, has ticks. From left to right, the ticks are labeled and There is a dashed vertical line segment at A horizontal line segment from to is labeled bracket. It has three branches labeled as base, spring, and clamp. A horizontal line segment from to above bracket is base, a horizonal line segment from to below base is spring, and a horizontal line segment from to below bracket is clamp. Horizonal line segments base and clamp has two branches each. Base has two branches, clamp and housing. A horizontal line segment from to above base is clamp and a horizontal line segment from to below base is housing. The third branch of bracket that is clamp has two branches, handle and casting. A horizontal line segment from to above clamp is labeled handle and a horizontal line segment from to below clamp is labeled casting. The branch clamp of base has two branches, handle and casting. A horizontal line segment from to above clamp is labeled handle and a horizontal line segment from to below clamp is labeled casting. Housing has two branches, bearing and shaft. A horizontal line segment from to above housing is labeled bearing and a horizontal line segment from to below housing is labeled shaft.
B
Time in weeks
Horizontal line labeled Time in weeks, has ticks. From left to right, the ticks are labeled and There is a dashed vertical line segment at A horizontal line segment from to is labeled bracket. It has three branches labeled as base, spring, and clamp. A horizontal line segment from to above bracket is base, a horizontal line segment from to below base is spring, and a horizontal line segment from to below bracket is clamp. Horizontal line segments base and clamp has two branches each. Base has two branches, clamp and housing. A horizontal line segment from to above base is clamp and a horizontal line segment from to below base is housing. The third branch of bracket that is clamp has two branches, handle and casting. A horizontal line segment from to above clamp is labeled handle and a horizontal line segment from to below clamp is labeled casting. The branch clamp of base has two branches, handle and casting. A horizontal line segment from to above clamp is labeled handle and a horizontal line segment from to below clamp is labeled casting. Housing has two branches, bearing and shaft. A horizontal line segment from to above housing is labeled bearing and a horizontal line segment from to below housing is labeled shaft.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started