Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

ase and answer ALL the questions that follow. The KwaZulu-Natal Provincial Department has embarked on a multi-million rand Transport Rehabilitation Initiative (TRI). The initiative has

ase and answer ALL the questions that follow. The KwaZulu-Natal Provincial Department has embarked on a multi-million rand Transport Rehabilitation Initiative (TRI). The initiative has been identified as one that will ensure that the transportation networks and systems of the province will be categorized as being world class by year 2020. This will however include a series of projects that will encompass the construction of bridges, dual carriageways, railway networks, ports and airports. One of the first projects that will be carried out under the initiative will be the expansion of the Durban Port, this is aimed at increasing its current holding capacity and overall operational efficiency. The KwaZulu-Natal MEC of Transport has indicated that the success of TRI heavily depends on the efficient management of the different projects of the initiative. One of the project initiatives includes the mounting of a filter system which is aimed at reducing air pollution during the series of the projects that will be performed. The Department of Environmental Affairs has given the TRI team16 weeks to install a complex air filter system and it has warned that it may be forced to discontinue the project unless the filter system is stored, within the allocated period. Jacob Naude, the project manager wants to ensure that the installation of the filtering system progresses smoothly and on time. He has therefore identified eight activities and their estimated times (weeks) that need to be completed in order for the project to be successfully completed. When the project begins two activities can be simultaneously started, building the internal components for the device (Activity A- 2 weeks) and the modifications necessary for the floor and the roof (Activity B- 3 weeks). The construction of the collection stack (Activity C- 2 weeks) can begin when the internal components are completed. Pouring of the concrete floor and installation of the frame (Activity D- 4 weeks) can be started as soon as the internal components are completed and the roof and the floor have been modified. After the collection stack has been constructed, two activities can begin: building the high temperature burner (Activity E- 4 weeks) and installing the pollution control system (Activity F- 3 weeks). The air pollution device can be installed (Activity G- 5 weeks) after the concrete floor has been poured, the frame has been installed, and the high temperature burner has been built. Finally, after the control system and pollution device has been installed, the system can be inspected and tested (Activity H- 2 weeks).

QUESTION 1 (40 Marks) 1.1 Having taken the responsibility of being the principal project manager, the MEC has requested that you provide a detailed report outlining the series of steps, basic processes/concepts that will be followed during the Durban Port Expansion project life cycle. The report should include detailed explanations of activities and actions that will be performed during each life cycle phase of the project. (20 marks)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

General Aviation Marketing And Management

Authors: C. Daniel Prather

3rd Edition

9781575243016

More Books

Students also viewed these General Management questions