Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Assign overhead using traditional costing and ABC; compute unit costs extinguishers classify activities as value- or non- value-added P4.1A (LO 1,2,3), A mbat Fire, Inc.
Assign overhead using traditional costing and ABC; compute unit costs extinguishers classify activities as value- or non- value-added P4.1A (LO 1,2,3), A mbat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire e fire extinguisher and (2) a commercial fire extinguisher. The home model is a : (1) a high-volume (54,000 units), half-gallon cylinder that holds 2 1/2 pounds of multi-purpose dry chemi- cal at 480 PSI. The commercial model is a low-volume (10,200 units), two-gallon cylinder that holds 10 pounds of multi-purpose dry chemical at 390 PSI. Both products require 1.5 hours of direct labor for completion. Therefore, total annual direct labor hours are 96,300 or [1.5 hours x (54,000 + 10,200)]. Estimated annual manufacturing overhead is $1,584,280. Thus, the predetermined overhead rate is $16.45 or ($1,584,280 96,300) per direct labor hour. The direct materials cost per unit is $18.50 for the home model and $26.50 for the commercial model. The direct labor cost is $19 per unit for both the home and the commercial models. @m Excel The company's managers identified six activity cost pools and related cost drivers and accumulated overhead by cost pool as follows. Estimated Use of Drivers by Product Activity Cost Pools Receiving Forming Assem Testing Painting Packing and shipping Cost Drivers Pounds Machine hours Number of parts Number of tests Gallons Pounds Estimated Overhead $ 80,400 150,500 412,300 51,000 52,580 837,500 $1,584,280 Estimated Use of Cost Drivers 335,000 35,000 217,000 25,500 5,258 335,000 215,000 27,000 165,000 15,500 3,680 215,000 Commercial 120,000 8,000 52,000 10,000 1,578 120,000 bling Instructions a. Unit cost-H.M. $62.18 a. Under tradition al product costing, compute the total unit cost of each product. Prepare a simple comparative schedule of the individual costs by product (similar to Illustration 4.3). b. Under ABC, prepare a schedule showing the computations of the activity-based overhead rates (per cost driver). c. Prepare a schedule assigning each activity's overhead cost pool to each product based on the use of C. Cost assigned-H.M $1,086,500 Cost/unit-HM. $57.62 cost drivers. (Include a computation of overhead cost per unit, rounding to the nearest cent.) d. Compute the total cost per unit for each product under ABC. e. Classify each of the activities as a value-added activity or a non-value-added activity. f. Comment on 1) the comparative overhead cost per unit for the two products under ABC, and d. (2) the comparative total costs per unit under traditional costing and ABC
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started