Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Assignments No. 3 - Due 9/30/2021 Use the attached parameter cost information from historical data about existing finished projects, based on 1990 pricing, to compute
Assignments No. 3 - Due 9/30/2021 Use the attached parameter cost information from historical data about existing finished projects, based on 1990 pricing, to compute the construction costs of a proposed office building in Indianapolis, IN. The building is a structural steel frame building and has exterior metal curtain walls. The construction of the building is expected to start in January 2022 and last 2 years. The parameter measures, design ratios, etc., for this building are as follows: 396,000 sf 392,000 sf 34,500 sf 45,250 sf 1,475,750 sf 14 1. Gross enclosed area 2. Gross area supported (excl. slab on grade) 3. Total basement floor area 4. Roof area 5. Net finished area 6. Number of floors including basement 7. Number of floors excluding basement 8. Area of face brick 9. Area of exterior wall (excluding brick) 10. Area of curtain wall including glass 11. Store front perimeter 12. Interior partitions 13. HVAC 13 4, 300 sf 35,340 sf 99,250 sf 122 sf 37,700 sf 1,150 tons 2. duct from central plant 12,100 sf 14. Parking area "General Information: Area of typical floor Story height, typical floor Area of main lobby No. of plumbing fixtures No. of elevators 2, 7610 sf 13 ft 2,010 sf 295 7 Design Ratios: A/C ton per building sf Parking sf per building sf Plumbing fixtures per building sf 0.0029 0,0299 0.0007 Assignments No. 3 - Due 9/30/2021 Use the attached parameter cost information from historical data about existing finished projects, based on 1990 pricing, to compute the construction costs of a proposed office building in Indianapolis, IN. The building is a structural steel frame building and has exterior metal curtain walls. The construction of the building is expected to start in January 2022 and last 2 years. The parameter measures, design ratios, etc., for this building are as follows: 396,000 sf 392,000 sf 34,500 sf 45,250 sf 1,475,750 sf 14 1. Gross enclosed area 2. Gross area supported (excl. slab on grade) 3. Total basement floor area 4. Roof area 5. Net finished area 6. Number of floors including basement 7. Number of floors excluding basement 8. Area of face brick 9. Area of exterior wall (excluding brick) 10. Area of curtain wall including glass 11. Store front perimeter 12. Interior partitions 13. HVAC 13 4, 300 sf 35,340 sf 99,250 sf 122 sf 37,700 sf 1,150 tons 2. duct from central plant 12,100 sf 14. Parking area "General Information: Area of typical floor Story height, typical floor Area of main lobby No. of plumbing fixtures No. of elevators 2, 7610 sf 13 ft 2,010 sf 295 7 Design Ratios: A/C ton per building sf Parking sf per building sf Plumbing fixtures per building sf 0.0029 0,0299 0.0007
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started