Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Assume, you are the owner of a particular chain retail store. With the advancement of technology, you are thinking of a new computer system for

Assume, you are the owner of a particular chain retail store. With the advancement of technology, you are thinking of a new computer system for information, accounting, and inventory control. Star tech Ltd. has sent the following information about installing new computer system:image text in transcribed

Normal Cost 36000 A B 4 00 12 80 C D 60 E 70 F 16 0 G H I 4 1 6 8 2 12 3 8 24000 16000 0 10 0 8000 Activity Description Optimistic Most likely Pessimistic Task Actual cost Time Time completed (%) Select the computer 4 6 8 100 38000 model Design input/output 5 7 15 24000 100 22000 system Design Monitoring 16000 13000 system Assemble computer 15 20 25 20000 14000 hardware Develop the main 10 18 26 9000 6000 programme Develop input/output 8 9 10000 routine Create database Install the system Test and implement 7 21000 From the previous experience, it is clear to your company that selection of computer model must be done before designing input/output system and design monitoring system. The company can assemble computer system and develop the main programme only when it has designed input/output system appropriately. On the other hand, developing input/output routine requires that the company has already designed monitoring system. Once the main programme is developed, the company can create data base. But, to install the system, both assemble computer system and development of input/output routine must remain completed. Finally, the testing and implementation stage require that the company has already created database and installed the system. Requirement: Using PERT method, determine the critical path and compute the expected completion time. ii. Determine the average daily cost for each activity and the probability that the project will be completed within maximum 53 days. iii. After 30 days, you have calculated the percentage of tasks completed (see percentage of task completed column). Determine whether the project is going as planned or not. Suggest your policy

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting

Authors: LibbyShort

7th Edition

78111021, 978-0078111020

Students also viewed these Accounting questions