Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Assume you have a multi-level feedback queue (MLFQ) scheduler (c) Calculate the RESPONSE TIME and TURNROUND TIME (in part b) for Job A. (d) Calculate

Assume you have a multi-level feedback queue (MLFQ) scheduler

image text in transcribed

(c) Calculate the RESPONSE TIME and TURNROUND TIME (in part b) for Job A.

(d) Calculate the RESPONSE TIME and TURNROUND TIME (in part b) for Job B

(a) Assume a 3-level MLFQ (high priority is 2, low priority is 00. Assume two jobs (A and B), both BATCH jobs (no l/o), each with a run-time of 10time units, and both entering the system at Tat0. Assume the quantum length at the highest priority level is 1, then 2 at the middle, and 3 for the lowest priority. Draw a picture of how the scheduler behaves for these jobs. Make sure to LABEL the x-axis Priority 1 l (b Assume the same scheduling parameters as above. Now the jobs are different; A and B both are BATCH jobs that each run for 10 time units (no I/O again), but this time A enters atT 0 whereas Benters the system atT 6. Draw a picture of how the scheduler behaves for these jobs. Make sure to LABEL the x-axis. Priority 1 l

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Data Management Databases And Organizations

Authors: Watson Watson

5th Edition

0471715360, 978-0471715368

More Books

Students also viewed these Databases questions

Question

=+Where do you want to live and work?

Answered: 1 week ago