Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Atoll bridge across the Mississippi River is being considered as a replacement for the current l-40 bridge linking Tennessee to Arkansas. Because this bridge, if

image text in transcribed

Atoll bridge across the Mississippi River is being considered as a replacement for the current l-40 bridge linking Tennessee to Arkansas. Because this bridge, if approved, will become a part of the U.S. Interstate Highway system, the B-C ratio method must be applied in the evaluation. Assume that the initial surfacing of the bridge is included in the initial investment costs of the structure a. What is the capitalized worth of the bridge (for the new design)? b. Determine the B-C ratio of the bridge over an infinite time horizon (for the new design) c. Should the initial design or the new design be selected? Click the icon to view the additional information about the initial and new designs Click the icon to view the interest and annuity table for discrete compounding when the MARR is 7% per year 1 More Info Initial design Investment costs of the structure are estimated to be $17,000,000, and $325,000 per year in operating and maintenance costs are anticipated. In addition, the bridge must be resurfaced every fifth year of its 30-year projected life at a cost of $1,360,000 per occurrence (no resurfacing cost in year 30). Revenues generated from the toll are anticipated to be $2,400,000 in its first year of operation, with a projected annual rate of increase of 2.25% per year due to the anticipated annual increase in traffic across the bridge. Assume that market (salvage) value for the bridge at the end of 30 years is zero and a MARR is 7% per year New design Suppose that the toll bridge can be redesigned such that it will have a (virtually) infinite life. Revised costs and revenues (benefits) are given as follows Capital investment: $22,700,000 Annual operating and maintenance costs: $230,000 Resurface cost every seventh year: $1,080,000 Structural repair cost, every 21th year: $1,700,000 Revenues (treated as constant, no rate of increase): $3,140,000 MARR remains at 7% per year

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Value Based Management Context And Application

Authors: Glen Arnold, Matt Davies

1st Edition

0471899860, 978-0471899860

More Books

Students also viewed these Accounting questions

Question

Describe the role of HRD practitioners in OD interventions

Answered: 1 week ago