Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Availability: Total available production time is 8.5 hours (510 minutes) per shift. There is a 30-minute unpaid lunch break and two 10-minute breaks - a
Availability: Total available production time is 8.5 hours (510 minutes) per shift. There is a 30-minute unpaid lunch break and two 10-minute breaks - a total of 50 regularly scheduled minutes of planned downtime. Therefore, the available production time is 460 minutes (27,600 seconds) per shift. Shipping: Location = staging area Frequency/method = daily/UPS Finished-goods inventory = 2,000 units Marking: Cycle time = 50 seconds Changeover= 5 minutes Availability = 27,600 seconds Uptime = 99% Operator = 1 WIP = 2000 units between testing and marking Time between marking and shipping: 4 days Testing: Cycle time = 30 seconds Changeover = 5 minutes Availability = 27,600 seconds Uptime = 99% Operator = 1 WIP = 2000 units between crimping and testing Time between testing and marking: 4 days Crimping: Cycle time = 40 seconds Changeover= 5 minutes Availability = 27,600 seconds Uptime = 99% Operator = 1 Shifts= 1
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started