Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Availability: Total available production time is 8.5 hours (510 minutes) per shift. There is a 30-minute unpaid lunch break and two 10-minute breaks - a

Availability: Total available production time is 8.5 hours (510 minutes) per shift. There is a 30-minute unpaid lunch break and two 10-minute breaks - a total of 50 regularly scheduled minutes of planned downtime. Therefore, the available production time is 460 minutes (27,600 seconds) per shift. Shipping: Location = staging area Frequency/method = daily/UPS Finished-goods inventory = 2,000 units Marking: Cycle time = 50 seconds Changeover= 5 minutes Availability = 27,600 seconds Uptime = 99% Operator = 1 WIP = 2000 units between testing and marking Time between marking and shipping: 4 days Testing: Cycle time = 30 seconds Changeover = 5 minutes Availability = 27,600 seconds Uptime = 99% Operator = 1 WIP = 2000 units between crimping and testing Time between testing and marking: 4 days Crimping: Cycle time = 40 seconds Changeover= 5 minutes Availability = 27,600 seconds Uptime = 99% Operator = 1 Shifts= 1

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamentals Of Quality Control And Improvement

Authors: Amitava Mitra

5th Edition

1119692334, 978-1119692331

More Books

Students also viewed these General Management questions