Answered step by step
Verified Expert Solution
Question
1 Approved Answer
AVIATION INSTITUTE OF MAINTENANCE NON-METALLIC STRUCTURES PROJECT A8 Name: Ahmed Algahim Date: 11/22/23 ITEM(S): Score: Apply Finishing Materials STUDENT PERFORMANCE GOALS: OBJECTIVE: PROCEDURE: Sand
AVIATION INSTITUTE OF MAINTENANCE NON-METALLIC STRUCTURES PROJECT A8 Name: Ahmed Algahim Date: 11/22/23 ITEM(S): Score: Apply Finishing Materials STUDENT PERFORMANCE GOALS: OBJECTIVE: PROCEDURE: Sand and rub aircraft finishes. Apply primer to aluminum alloy parts. Use and maintain a paint spray gun. 1. The student will prepare and paint an instructor provided aluminum project and write a brief outline of the procedures. Scoring: this procedure is worth 40 points. 30 points for outline content and 10 points for neatness and legibility. Points awarded: 2. Instructor will evaluate completed project. Scoring: this procedure is worth 40 points. Each defect is minus 5 points. Points awarded: cle yhaqq 3. Student will ensure all painting, sanding areas and equipment have been properly cleaned and stored in proper locations. Instructor will verify cleanliness of areas and equipment. Scoring: this procedure is worth 20 points. Points awarded: THIS PROJECT COMPLIES WITH THE FOLLOWING REQUIRED ACS ELEMENTS: AM.I.G.S9 Identify finishing materials and appropriate thinners. Prepare metal surface for painting. AM.I.G.S11 Page 1 of 3eM-noM
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started