b. The hydroelectric facility that has been proposed will consist of a turbine with an efficiency of 90.4%. The facility will be located at
b. The hydroelectric facility that has been proposed will consist of a turbine with an efficiency of 90.4%. The facility will be located at a vertical depth of 15.2 m below the riverbed. The river flows with the following properties: hydraulic diameter of 7.10 m o slope of 0.033 O wetted perimeter of 12.6 m a Chzy coefficient of 4.95 m0.5 s-1. The density of the river water is 998.2 kg m-3, and the acceleration due to gravity is 9.81 m s-2 Assuming that the turbine operates for 95.0% of the time and one year is approximately 3.1536 x 107 s, calculate: i. the mass flow rate of the river (5 marks) ii. the maximum energy that could be extracted annually from the river flow. (5 marks) < Previous T271 EMA: Section B Next > Question 4
Step by Step Solution
★★★★★
3.38 Rating (145 Votes )
There are 3 Steps involved in it
Step: 1
i To calculate the mass flow rate of the river we can use the formula mass flow rate density x area ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started