Question
1 Approved Answer
Based on the above, the first activity that is selected to reduce the project duration is project duration at the CRASH POINT (the minimum possible
Based on the above, the first activity that is selected to reduce the project duration is project duration at the CRASH POINT (the minimum possible duration for the project) is days. The indirect cost with normal times is $300 and there is a savings $25 per period reduced. The crash cost (cost at the CRASH POINT) is $ .
The optimum cost-time schedule (the schedule with minimum total cost and corresponding time) is Note Enter the values for each item within square brackets.
Crash cost (slope) Task Name Normal Normal Crash Predecessor time cost time 35 100 3. 10 B. 4 30 80 90 25 D. AB 3. 25 B.C 95 2. D. 100 90 30 D.E 20 H. 35 F.G.H 1. 85 n54 24 24
Step by Step Solution
★★★★★
3.50 Rating (167 Votes )
There are 3 Steps involved in it
Step: 1
chashing detivityA by itany Additional rasheng Crash leter ine cort 20f crashing2 set...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started