Question
Bateman Company produces helmets for drivers of motorcycles. Helmets are produced in batches according to model and size. Although the setup and production time vary
Bateman Company produces helmets for drivers of motorcycles. Helmets are produced in batches according to model and size. Although the setup and production time vary for each model, the smallest lead time is six days. The most popular model, Model HA2, takes two days for setup, and the production rate is 675 units per day. The expected annual demand for the model is 32,400 units. Demand for the model, however, can reach 40,500 units. The cost of carrying one HA2 helmet is $3 per unit. The setup cost is $5,400. Bateman chooses its batch size based on the economic order quantity criterion. Expected annual demand is used to compute the EOQ.
Recently, Bateman has encountered some stiff competitionespecially from foreign sources. Some of the foreign competitors have been able to produce and deliver the helmets to retailers in half the time it takes Bateman to produce. For example, a large retailer recently requested a delivery of 10,800 Model HA2 helmets with the stipulation that the helmets be delivered within seven working days. Bateman had 2,700 units of HA2 in stock. Bateman informed the potential customer that it could deliver 2,700 units immediately and the other 8,100 units in about 14 working dayswith the possibility of interim partial orders being delivered. The customer declined the offer indicating that the total order had to be delivered within seven working days so that its stores could take advantage of some special local conditions. The customer expressed regret and indicated that it would accept the order from another competitor who could satisfy the time requirements.
Required:
1. Calculate the optimal batch size for Model HA2 using the EOQ model. Round your answer to the nearest whole number if rounding is required. ? units
2. How much additional inventory would have been needed to meet the customer's requirements?
additional units
3. Fenton Gray, the head of industrial engineering, reacted differently to the lost order: "Our problem is more complex than insufficient inventory. I know that our foreign competitors carry much less inventory than we do. What we need to do is decrease the lead time. I have been studying this problem, and my staff has found a way to reduce setup time for Model HA2 from two days to 1.5 hours. Using this new procedure, setup cost can be reduced to about $94. Also, by rearranging the plant layout for this productcreating what are called manufacturing cellswe can increase the production rate from 675 units per day to about 1,800 units per day. This is done simply by eliminating a lot of move time and waiting timeboth non-value-added activities." Assume that there are eight hours available in each workday.
Assume that the engineer's estimates are on target. Compute the new optimal batch size (using the EOQ formula). Round your answer to the nearest whole number.
? units
What is the new lead time? Round your answer to one decimal place.
? hours
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started