Begin by selecting the formula to allocate overhead (OH) costs. Then enter the amounts to calculate the revised finishing activity cost per rim. Predetermined OH

Begin by selecting the formula to allocate overhead (OH) costs. Then enter the amounts to calculate the revised finishing activity cost per rim. Predetermined OH allocation rate Actual qty of the allocation base used = Allocated mfg. overhead costs 40 3 = $120