Below are the correct answers I just need to see in a completed spreadsheet. A company manufactures four types of bicycles: standard, cruiser, sport, and

Below are the correct answers I just need to see in a completed spreadsheet.

A company manufactures four types of bicycles: standard, cruiser, sport, and off-road. Over the coming month, they need assistance in determining how many of each bicycles to manufacture to maximize their profits.

Bicycles have to go through four industrial processes in order to be manufactured: stamping, welding, assembly, and inspection. In addition, there are storage limits as all of the produced items must be stored in the warehouse. Finally, the company has determined the minimum number of each bicycle they have to make to satisfy customers demand.

The following tables contains all of the relevant data for each bicycle type including the amount of time required in each department (in hours), the storage requirement (in sq.ft), and the profit per unit along with the minimum number of bikes required.

Bicycles

Stamping

Welding

Assembly

Inspection

Storage Space

Standard

1.3

2.3

2.1

1.5

4.2

Cruiser

1.9

3.1

2.4

2.3

5.6

Sport

3.5

3.3

3.3

3.2

5.0

Off-road

4.2

4.0

4.5

4.0

6.2

Limits

8000

8000

8000

8000

30000

Bicycles

Min Sales

Profit

Standard

50

115

Cruiser

50

310

Sport

100

400

Off-road

100

225

A company wants to determine how many of each bicycle should be manufactured given all of the limitations such that they achieve the maximum possible profit. Solve the linear optimization problem in Excel to determine the optimal production plan (do not require your decision variables to be integers at this point).

Upload your solution. Please make sure to scroll down to see all the questions related to this problem.

20. Based on your solution, the optimal number of Standard Bicycles to manufacture is

Correct answer: 50

21. Based on your solution, the optimal number of Cruiser Bicycles to manufacture is

Correct answer: 305.24

22. Based on your solution, the Final Value of the objective function is

Correct answer: $915,450.87

Results for question 23.

23. Based on your solution, the total time needed in Assembly department for your optimal solution is

Correct answer: 7826.33

24. Based on the Sensitivity report generated for your solved model, changing cell Profit for each Sport Bicycle from $400 to $500 will cause the Final Value of the objective function to increase by

Correct answer: $198,144.10

25. Based on the Sensitivity report for your solved model, changing Profit for each Cruiser Bike from $310 to $380 will cause the Final Value of the objective function to increase by

Correct answer: Can't be determined as the model must be resolved.

26. Based on the Sensitivity report for your solved model, increasing the time available for Inspection from 8,000 to 8,500 hours will cause the cause the Final Value of the objective function to increase by

Correct answer: $0

27.Based on the Sensitivity report for your solved model, changing the time available for Stamping from 8,000 to 8,500 hours will cause the cause the Final Value of the objective function to increase by

Correct answer:$2,369

28. Based on the Sensitivity report for your solved model, changing the time available for Welding from 8,000 to 7,500 hours will cause the cause the Final Value of the objective function to decrease by

Correct answer: $35,480.35

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Strategic management concepts

Authors: Fred david

13th Edition

9780136120988, 136120997, 136120989, 978-0136120995

More Books

Students also viewed these General Management questions

Question

12. What does the Second Welfare Theorem predict?

Answered: 1 week ago