Berkeley Manufacturing has decided to use an R-Chart to monitor the changes in the variability of their 38.00 pound industrial belts. The quality control manager
Berkeley Manufacturing has decided to use an R-Chart to monitor the changes in the variability of their 38.00 pound industrial belts. The quality control manager randomly samples 8 industrial belts and measures the weight of the sample (in pounds) at 18 successive time periods. Table Control Chart Step 2 of 7: What is the Upper Control Limit? Round your answer to three decimal places