BILL OF QUANTITIES AND COST ESTIMATE OF PROPOSED Project for ITG 401 Summer One Course ITEM DESCRIPTION Unit Qtity Rate in AED Amount 1 Site

BILL OF QUANTITIES AND COST ESTIMATE OF PROPOSED Project for ITG 401 Summer One Course

ITEM

DESCRIPTION

Unit

Qtity

Rate in AED

Amount

1

Site installation: To include general site clearing,erecting site signpost , temporary fence on the site, temporary connection to water and powerect

SUM

1

500,000

ELEMENT 01 SUBSTRUCTURE

Unit

Qtity

Rate in AED

Amount

EARTH WORKS

1

Excavate oversite average 100 mm deep to remove and cart away vegetable soil

SM

60

200

2

Excavation of foundation trenches and back filling after construction ,

CM

70

2,000

Blinding class 20 under strip foundations an bases , thickness 50mm

CM

1

60,000

Stones masonry

Natural Stone foundation; in cement and sand (1:3) mortar 400mm wide

CM

2

25,000

Sub-structure (All Provisional) Carried to Summary

Sub-structure (All Provisional) Carried to Summary

Column bases

CM

13

120,000

Columns

CM

11

120,000

beams

CM

12

120,000

Burnt Clay bricks masonory walling in cement mortar (1:3)

200 mm Thick

CM

172

55,000

RHS 60x40x 3mm RHS for trusses (Rafters )

LM

175

7,000

RHS 40x40x2mm RHS Purlines and internal members

LM

198

6,000

RHS 60x40x 3mm RHS for trusses (Rafters )

LM

350

55,000

RHS 40x40x2mm RHS Purlines and internal members

LM

350

55,000

Roof coverings

SM

320

5,500

1.5mm thick MS sheet gutters including painting

LM

25

2,300

Weather guard paint applied in

LM

220

3,000

600mm wide apron in concrete grade 20 to receive wood float, smoothened l, color of additives

LM

132

7,500

Supply and fix Ceramic wall tiles including bedding

SM

16

8,500

OUND FLOOR Plaster to walls , columns and beams

SM

400

1,800

3mm thick Plastic ceiling to approved color

SM

71

6,500

EXCAVATION

Excavation in sandy soil or any other soil. The price includes excavation for any un wanted existing soil, organics, etc to any levels as per engineer instruction and approval drawings.The price also includes transportation of excavated material to approved dump area according to supervision engineers instructions, and includes using shutter bracing to the excavation sides.

L.S

1

550,000

Backfilling by using (Sand) around foundations , walls & any other element for building to design levels up to the ground floor slab level and outside yard, which shall be spread in layers not exceeding 25 cm and compacted (98%) as shown in the drawings and mentioned in the specifications and according to the engineer's instructions.

m

670

12,000

CONCRETE (B - 200)

6" Solid Block (400 mm x 200 mm x 200 mm)

mm

12,750

8" Insulated Block (400 mm x 200 mm x 200 mm)

mm

13,600

12" Insulated Block (400 mm x 300 mm x 200 mm)

mm

14,250

Cement

KG

50 US Tons

CARRIER 60 Ton Air Cooled Chiller

1

3

20,000 Gallon Water Storage Tank

m

4

60x60 Light LED / 60 Watts Energy

1

2,350

Labor Man Hours

Hrs

2,000,000

8.75 AED/Hrs

Overhead 59 % of Prime Cost

Contingency 3.85%

1

1

Escalation 7 %

PC Sums

1

3

200,000

Mark-Up for Profit is 8%

Calculate the Project Selling Price

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing Cases

Authors: Frank A. Buckless, Mark. S. Beasley, Steven M. Glover, Douglas F. Prawitt

1st Edition

978-0130800015

More Books

Students also viewed these Accounting questions