Black and Blue Sports Inc. manufactures two products: snowboards and skis. The factory overhead incurred is as follows: 1 Indirect labor $507,000.00 2 Cutting Department
Black and Blue Sports Inc. manufactures two products: snowboards and skis. The factory overhead incurred is as follows:
1 | Indirect labor | $507,000.00 |
2 | Cutting Department | 156,000.00 |
3 | Finishing Department | 192,000.00 |
4 | Total | $855,000.00 |
The activity base associated with the two production departments is direct labor hours. The indirect labor can be assigned to two different activities as follows:
1 | Activity | Budgeted Activity Cost | Activity Base |
2 | Production control | $237,000.00 | Number of production runs |
3 | Materials handling | 270,000.00 | Number of moves |
4 | Total | $507,000.00 |
|
The activity-base usage quantities and units produced for the two products follow:
Number of | Number of | Direct Labor Hours | Direct Labor Hours | Units | |
Production Runs | Moves | Cutting | Finishing | Produced | |
Snowboards | 430 | 5,000 | 4,000 | 2,000 | 6,000 |
Skis | 70 | 2,500 | 2,000 | 4,000 | 6,000 |
Total | 500 | 7,500 | 6,000 | 6,000 | 12,000 |
Required: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1. Determine the factory overhead rates under the multiple production department rate method. Assume that indirect labor is associated with the production departments, so that the total factory overhead is $315,000 and $540,000 for the Cutting and Finishing departments, respectively.* ** | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2. Determine the total and per-unit factory overhead costs allocated to each product, using the multiple production department overhead rates in (1).* ** | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
* If required, round your answers to two decimal places. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1. Determine the factory overhead rates under the multiple production department rate method. Assume that indirect labor is associated with the production departments, so that the total factory overhead is $315,000 and $540,000 for the Cutting and Finishing departments, respectively. If required, round your answers to two decimal places. Refer to the Amount Descriptions list provided for the exact wording of the answer choices for text entries.
2. Determine the total and per-unit factory overhead costs allocated to each product, using the multiple production department overhead rates in (1). If required, round your answers to two decimal places. Refer to the Amount Descriptions list provided for the exact wording of the answer choices for text entries. Question not attempted. Score: 0/28
Points: 0 / 6 Feedback Calculate for each product: Activity base-usage x Department Rate from Req. (1) = Allocated factory overhead for each department Then sum all department costs per product to determine a total and divide the total overhead by budgeted units to derive the overhead per unit for each product.
Points: 8 / 23 Feedback Calculate for each activity: Overhead Activity base = Activity Rate Calculate for each product: Activity usage x Activity rate from Req. (3) = Activity cost; Sum all activity costs per product to determine a total and divide the total overhead by budgeted units to derive the activity costs per unit for each product. Activity Table - Skis Shaded cells have feedback.
Points: 8 / 23 Feedback Calculate for each activity: Overhead Activity base = Activity Rate Calculate for each product: Activity usage x Activity rate from Req. (3) = Activity cost; Sum all activity costs per product to determine a total and divide the total overhead by budgeted units to derive the activity costs per unit for each product.
|
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started