Question
Bluecap Co. uses a standard cost system and flexible budgets for control purposes. The following budgeted information pertains to 2019: Denominator volumenumber of units 9,000
Bluecap Co. uses a standard cost system and flexible budgets for control purposes. The following budgeted information pertains to 2019:
Denominator volumenumber of units | 9,000 | ||
Denominator volumepercent of capacity | 90 | % | |
Denominator volumestandard direct labor hours (DLHs) | 27,000 | ||
Budgeted variable factory overhead cost at denominator volume | $ | 103,700 | |
Total standard factory overhead rate per DLH | $ | 15.10 | |
During 2019, Bluecap worked 31,000 DLHs and manufactured 9,100 units. The actual factory overhead cost for the year was $13,000 greater than the flexible budget amount for the units produced, of which $5,000 was due to fixed factory overhead. In preparing a budget for 2020 Bluecap decided to raise the level of operation to 90% of capacity (a level it considers to be "practical capacity"), to manufacture 8,500 units at a budgeted total of 25,500 DLHs.
The total budget for fixed factory overhead in 2019 for Bluecap Co., to the nearest whole dollar, was: (Round your intermediate calculation to 2 decimal places.)
Multiple Choice
-
$275,220.
-
$304,020.
-
$310,020.
-
$321,300.
-
$332,820.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started