Question
Bramble Fabrication produces custom-made security doors and gates. Currently two jobs are in process, 359 and 360. During production of Job 359, the supervisor was
Bramble Fabrication produces custom-made security doors and gates. Currently two jobs are in process, 359 and 360. During production of Job 359, the supervisor was on vacation, and the employees made several errors in cutting the metal pieces for the two doors in the order. The spoiled metal pieces cost $20 each and had zero scrap value. In addition, an order of five gates that had been manufactured for Job 360 required a fine wire mesh that sometimes tore as it was being mounted. Because a similar wire could be used that was much easier to install, the customer had been warned that costs could run over the bid if any difficulty was encountered in installing the wire. One of the gates was spoiled during the process of installing the wire. The cost of the materials and direct labour for the gate was $138. The gate and metal were hauled to the dump and discarded.
Prepare spoilage journal entries for both job 359 and job 360.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started