cade.com/reader/8000507a-ba17-41ee-9caa-39603fd9c37c/page/Bac03d8ebeab9f46eabeadd1c638 o 1000 Brincles of CORAGE P TY Mansfield Manufacturing Co. uses ABC. The factory overhead budget for the coming period is $750,000, consisting of the following Bulgated Ant . The potential alocation bases and their estimated amounts were as follows: Cool Numbwemo move Budged Amount 75 00 0.000 REQUIRED: 1 Determine the overhead rate for each cost pool using the most appropriate allocation base for each pool (Use each location base only once.) 2. Job 007 required $15,000 for direct materials, $20,000 for direct labor 800 dred labor hours, 1.200 machine hours, si setups, and four component parts Determine the cost of doo 3. Assume Mansfield used the direct labor hour method to apply factory overhead to Job 007. Determine the predetermined factory overhead rate using the direct labor hout method 4 Determine the cost of Job 007 using the direct labor hour method to apply factory overhead 5 What might have been the impact on Mansfield's profits it had used the direct labor hour method rather than the ABC method? cade.com/reader/8000507a-ba17-41ee-9caa-39603fd9c37c/page/Bac03d8ebeab9f46eabeadd1c638 o 1000 Brincles of CORAGE P TY Mansfield Manufacturing Co. uses ABC. The factory overhead budget for the coming period is $750,000, consisting of the following Bulgated Ant . The potential alocation bases and their estimated amounts were as follows: Cool Numbwemo move Budged Amount 75 00 0.000 REQUIRED: 1 Determine the overhead rate for each cost pool using the most appropriate allocation base for each pool (Use each location base only once.) 2. Job 007 required $15,000 for direct materials, $20,000 for direct labor 800 dred labor hours, 1.200 machine hours, si setups, and four component parts Determine the cost of doo 3. Assume Mansfield used the direct labor hour method to apply factory overhead to Job 007. Determine the predetermined factory overhead rate using the direct labor hout method 4 Determine the cost of Job 007 using the direct labor hour method to apply factory overhead 5 What might have been the impact on Mansfield's profits it had used the direct labor hour method rather than the ABC method