Question
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs:
Setup (1,000 setup hours) $118,000
Production scheduling (400 batches) 30,000
Production engineering (60 change orders) 90,000
Supervision (2,000 direct labor hours)
64,000 Machine maintenance (12,000 machine hours)
84,000 Total activity costs $386,000
The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5 hours Production scheduling 1 batch Machine hours used (25 Milling machine hours;5 Finishing machine hours) 30 hours Production engineering 3 change orders
(a) Calculate the cost per unit of activity driver for each activity cost category. Setup $ Answer Production scheduling $ Answer Production engineering $ Answer Supervision $ Answer Machine maintenance $ Answer
(b) Calculate the cost of Job 845 using ABC to assign the overhead costs. $ Answer
(c) Calculate the cost of Job 845 using the plantwide overhead rate based on machine hours. (Round your answer to the nearest dollar.) $ Answer
(d) Calculate the cost of Job 845 using a machine hour departmental overhead rate for the Milling Department ($31 per hour) and a direct hour overhead rate for the Finishing Department ($101 per hour). (Round your answer to the nearest dollar.) $ Answer
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance