Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company in the previous exercise consisted of the following activities and costs: Setup (1,000

Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company in the previous exercise consisted of the following activities and costs:

Setup (1,000 setup hours) $156,000
Production scheduling (400 batches) 72,000
Production engineering (60 change orders) 120,000
Supervision (2,000 direct labor hours) 56,000
Machine maintenance (12,000 machine hours) 84,000
Total activity costs $488,000

The following additional data were provided for Job 845

Direct materials costs $10,000
Direct labor cost (5 Milling direct labor hours;
35 Finishing direct labor hours) $4,000
Setup hours 5 hours
Production scheduling 1 batch
Machine hours used (25 Milling machine hours;
5 Finishing machine hours) 30 hours
Production engineering 3 change orders

a. Calculate the cost per unit of activity driver for each activity cost category.

Setup

Production scheduling cost

Production engineering cost

Supervision cost
Machine operating cost

b. Calculate the cost of Job 845 using ABC to assign the overhead costs.

Job 845
Direct materials cost
Direct labor cost
Manufacturing overhead costs:
Setup costs
Production scheduling
Production engineering
Supervision
Machine operations
Total cost

c. Calculate the cost of Job 845 using a company-wide overhead rate based on machine hours. Round rate to two decimal places. Company-wide overhead rate $Answer per machine hour Use rounded overhead rate calculated above for calculations below. Round cost answers to the nearest whole number, when needed.

Job 845
Direct materials cost
Direct labor cost
Manufacturing overhead cost:
Total cost

d. Calculate the cost of Job 845 using a machine hour departmental overhead rate for the Milling Department and a direct labor hour overhead rate for the Finishing Department.

Milling Department manufacturing overhead $356,000
Finishing Department manufacturing overhead $132,000
Machine hours used
Milling Department 10,000 hours
Finishing Department 2,000 hours
Labor hours used
Milling Department 1,000 hours
Finishing Department 1,000 hours

Round rates to two decimal places, if needed. $Answer per Milling Dept. machine hour $Answer per Finishing Dept. direct labor hour

Use rounded overhead rates calculated above for calculations below. Round cost answers to the nearest whole number, when needed.

Job 845
Direct materials cost
Direct labor cost
Manufacturing overhead costs:
Milling Department
Finishing Department
Total cost

PreviousSave AnswersFinish attempt ...

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The ASQ Auditing Handbook

Authors: J. P. Russell,

4th Edition

0873898478, 978-0873898478

More Books

Students also viewed these Accounting questions