Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Can someone please provide answers and explanations to all parts of the questions? Thank you for your help! The High-Low Method Mixed cost behavior is

Can someone please provide answers and explanations to all parts of the questions? Thank you for your help!

The High-Low Method

Mixed cost behavior is displayed when activities use a mix of resources that are: (1) acquired in advance and (2) acquired as needed. Sometimes it is easy to identify the variable and fixed components of a mixed cost, as in the scenario in Step 2 for the Landry Security Systems sales representatives. Many times, however, the only information available is the total cost of an activity and a measure of output (the variables Y and X). Since accounting records typically show only the total cost and the associated output of a mixed cost item, it is necessary to separate an activity's total cost into its fixed and variable components.

The high-low method is a widely used quantitative method that separates a mixed cost into its fixed and variable components. The high-low method assumes a linear cost relationship: Y - F + VX. Since the accounting records reveal only X and Y, those values must be used to estimate the component parameters F and V.

Basic geometry tells us that two points determine a line. F, the fixed cost component, is the intercept of the total cost line, and V, the variable cost per unit, is the slope of the line. Given two points, the slope and the intercept can be determined. The high-low method preselects the two points that are used to compute the parameters F and V. The high point is defined as the point with the highest output or driver level. The low point is defined as the point with the lowest output or driver level. Note that the high and low points are determined by the independent variable, not the dependent variable (typically cost). With the two points identified, the slope (variable cost) is estimated first by the following equation:

V = (Y2 - Y1)/(X2 - X1)
V = (Cost of High Point - Cost of Low Point)/(High Activity Level - Low Activity Level)

Once the variable cost is calculated, the fixed cost is then calculated using the following formula and the values associated with either the high or the low point (but only the values from the same point):

F = Y - VX
F = Total Cost - (Variable rate Level of activity)

Apply the Concepts

Introduction:

McCourt Company had the following 10 months of data on materials handling cost and number of moves within its manufacturing plant:

Month Materials Handling Cost Number of Moves
January $5,600 475
February 3,090 125
March 2,780 175
April 8,000 600
May 1,990 200
June 5,300 300
July 4,300 250
August 6,300 400
September 2,000 100
October 6,240 425

Required:

1. Based on the above data, determine the high point and the low point for McCourt Company (provide the month, total cost and activity level (number of moves in your response)):
High point:
Month April
Cost 8000
Activity level (no. of moves) 600
Low point:
Month September
Cost 2000
Activity level (no. of moves) 100
2. Calculate McCourt Company's variable rate for materials handling based on the number of moves (round to the nearest cent):

Variable rate = $

3. Calculate McCourt Company's fixed monthly cost of materials handling (round to the nearest dollar):
Fixed cost = $

per month
4. Based on the variable rate and fixed monthly cost in Requirements 2 and 3, provide the following estimated materials handling costs for the coming year if the number of moves expected is 4,000 (round to the nearest dollar):
Expected annual fixed cost $

Expected annual variable cost $

Total annual materials handling cost $

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Beyond Agile Auditing Three Core Components To Revolutionize Your Internal Audit Practices

Authors: Clarissa Lucas

1st Edition

1950508676, 978-1950508679

More Books

Students also viewed these Accounting questions