Can you review the comprehensive implementation plan and support in making it a better version? Contents 1. Executive Summary 3 2. Introduction 3 Overview of

Can you review the comprehensive implementation plan and support in making it a better version?

Contents

1. Executive Summary 3

2. Introduction 3

Overview of Riverside Health Network 3

Current Scenario 3

Objectives of the HMIS Implementation 3

3. Key Challenges to be Addressed 3

Ranking of Key Areas Based on Impact 4

4. Comprehensive Health Management Information System Implementation Plan 5

PHASE I: PRE-IMPLEMENTATION PHASE 5

PHASE II: IMPLEMENTATION PHASE 5

PHASE III: POST-IMPLEMENTATION PHASE 6

Timeline Chart 7

Stakeholder Roles in HMIS Implementation 8

5. Address Key Organizational Components 9

5.2. Policy 10

5.3. Social Components 10

5.4. Legal Component 11

5.5. Organizational Component 11

6.Propose Solutions and Tools 12

12

Process Specific to RHN 13

7. Build a Business Case 14

Justification for Investment 14

Cost Analysis 15

Potential Risks and Mitigation Strategies 15

8. Conclusion 15

10. Appendices 16

Stakeholder Engagement Plan 16

Training Program Details 16

1. Executive Summary

This report outlines a comprehensive plan for implementing a robust Health Management Information System (HMIS) at Riverside Healthcare Network (RHN). The implementation plan addresses key challenges in data sharing, security, workflow efficiency, and compliance. A phased approach will be utilized, encompassing pre-implementation, implementation, and post-implementation phases, leveraging a hybrid model for optimal flexibility and scalability. The report includes governance structures, policies, stakeholder engagement strategies, and a business case to justify the investment.

By modernizing RHN's HMIS, we aim to improve care quality, operational efficiency, and compliance with healthcare regulations.

2. Introduction

Overview of Riverside Health Network

Riverside Healthcare Network (RHN) is a mid-sized healthcare provider operating in a metropolitan area. It consists of one main hospital and several affiliated clinics spread across the city, catering to a diverse patient population of approximately 50,000 individuals. RHN provides a wide range of healthcare services, including primary care, specialty care, emergency services, and advanced surgical procedures. The network prides itself on a patient-centered approach, striving to deliver high-quality, accessible, and cost-effective healthcare.

Current Scenario

RHN is currently facing significant challenges due to its outdated and fragmented Health Management Information System (HMIS). The existing system comprises multiple legacy systems that lack interoperability, leading to difficulties in data sharing, workflow inefficiencies, and security vulnerabilities. These issues are exacerbated by the rapid pace of technological advancement and the increasing complexity of regulatory requirements.

Objectives of the HMIS Implementation

The primary objective of the HMIS implementation is to transform RHN's healthcare delivery through a modern, integrated, and interoperable system. Key objectives include:

  • Enhancing data sharing and interoperability across departments, its own affiliated clinics and external facilities.
  • Improving data security and ensuring compliance with regulatory standards.
  • Streamlining workflows to enhance operational efficiency.
  • Supporting high-quality patient care through timely and accurate data access.

3. Key Challenges

Key Challenges in the Current HMIS Landscape at Riverside Healthcare Network (RHN)

  1. Fragmented Systems and Data Silos One of the most significant challenges facing RHN is the fragmentation of existing systems. Many healthcare organizations, including RHN, operate with a patchwork of legacy systems that do not communicate effectively with one another. These fragmented systems create data silos, where information is isolated within specific departments or subsystems, leading to difficulties in accessing comprehensive patient data across the organization.

Impact on Organizational Operations and Patient Care Fragmented systems hinder the seamless exchange of information, resulting in inefficiencies in clinical workflows and administrative processes. For example, a lack of interoperability between EHR and LIS can delay the availability of lab results, impacting clinical decision-making and patient outcomes. Moreover, data silos can lead to duplicated efforts, where staff must manually enter or transfer data between systems, increasing the risk of errors and reducing overall productivity

  1. Security Vulnerabilities and Compliance Issues The outdated and fragmented nature of RHN's current systems also poses significant security risks. Legacy systems often lack robust security features, making them vulnerable to cyberattacks and data breaches. Additionally, the fragmented nature of these systems complicates efforts to comply with regulatory requirements such as the Health Insurance Portability and Accountability Act (HIPAA), which mandates strict standards for the protection of patient information.

Impact on Organizational Operations and Patient Care Security vulnerabilities can have severe consequences for both the organization and its patients. Data breaches can lead to the unauthorized disclosure of sensitive patient information, resulting in loss of patient trust, legal repercussions, and financial penalties. Compliance issues can also lead to sanctions from regulatory bodies, further impacting the organization's reputation and financial stability.

  1. Workflow Inefficiencies The lack of integration among RHN's systems contributes to significant workflow inefficiencies. Clinical staff often need to navigate multiple systems to access patient information, place orders, and document care. This fragmented approach can lead to delays, increased administrative burden, and clinician frustration.

Impact on Organizational Operations and Patient Care Workflow inefficiencies directly impact the quality of patient care. Delays in accessing patient information can slow down diagnosis and treatment processes, potentially compromising patient outcomes. The increased administrative burden on clinical staff also detracts from the time they can spend with patients, further affecting the quality of care. Moreover, inefficient workflows can lead to burnout among healthcare providers, exacerbating staffing challenges and impacting overall organizational performance .

Ranking of Key Areas Based on Impact

Prioritization was done based on the overall impact on organizational operations and patient care, the ranking of key challenges in implementing a robust Health Management Information System (HMIS) at Riverside Healthcare Network (RHN). The prioritization takes into account the severity and breadth of each challenge, as well as their interdependencies.

1.Fragmented Systems and Data Silos Fragmented systems and data silos are ranked as thehighest priority because they have the most extensive impact on multiple facets of the organization. These issues affect data sharing, clinical workflows, and overall operational efficiency, which are foundational to the effective functioning of any healthcare organization.

2. Security Vulnerabilities and Compliance Issues Security vulnerabilities and compliance issues areranked secondbecause, while they are critically important, their impact is somewhat contingent upon the underlying system architecture and data management practices influenced by the first challenge.

3. Workflow Inefficiencies Workflow inefficiencies are ranked third, as they are often a symptom of the first two challenges. Addressing fragmented systems and security vulnerabilities can naturally lead to improvements in workflow efficiency.

4. Comprehensive Health Management Information System Implementation Plan

This plan outlines a structured approach to deploying an HMIS at RHN, ensuring a seamless transition and optimizing healthcare delivery efficiency. The implementation process is divided into three phases: Pre-Implementation, Implementation, and Post-Implementation. Each phase includes key activities to guarantee successful adoption:

PHASE I: PRE-IMPLEMENTATION PHASE

Needs Assessment (Month 1-2)

A comprehensive needs assessment will be conducted to understand the specific requirements and challenges of RHN. This will involve:

  • Surveys and interviews with key stakeholders, including clinical staff, administrative personnel, and IT professionals.
  • Analysis of current workflows and identification of pain points.
  • Evaluation of existing systems and their limitations.

Planning (Month 3-4)

Based on the needs assessment, a detailed project plan will be developed, outlining the scope, objectives, and timelines. This phase will include:

  • Formation of a project team with clearly defined roles and responsibilities.
  • Development of a project charter and governance framework.
  • Identification of critical success factors and key performance indicators (KPIs).

Vendor Selection (Month 5-6)

Selecting the right technology and vendor is crucial for the success of the HMIS implementation. The process will include:

  • Identifying and evaluating potential HMIS technologies and vendors.
  • Ensuring selected systems comply with HL7 FHIR standards for interoperability.
  • Conducting vendor demonstrations and evaluating proposals.
  • Finalizing contracts with selected vendors, ensuring clear terms for customization, support, and maintenance.

PHASE II: IMPLEMENTATION PHASE

System Design and Customization (Month 7-9)

The chosen HMIS will be customized to meet RHN's specific needs. Key activities include:

  • Collaborating with vendors to tailor the HMIS features and functionalities.
  • Designing interfaces for seamless integration with existing systems.
  • Ensuring compliance with security and regulatory requirements.

Pilot Testing (Month 10-11)

Pilot testing will be conducted in selected departments to validate the system's functionality and identify any issues. This phase will involve:

  • Setting up test environments and migrating sample data.
  • Conducting comprehensive testing, including usability, performance, and security tests.
  • Gathering feedback from users and making necessary adjustments.

Training and Change Management (Month 12-13)

A comprehensive training and change management program will be developed to ensure a smooth transition to the new HMIS. Activities include:

  • Developing training materials and conducting training sessions for all staff.
  • Implementing change management strategies to address resistance and facilitate adoption.
  • Providing ongoing support and resources for users.

Full Implementation (Month 13-15)

Following successful pilot testing, the HMIS will be rolled out across all departments. Key activities include:

  • System deployment and data migration.
  • Ensuring all users are trained and supported.
  • Monitoring system performance and addressing any issues promptly.

PHASE III: POST-IMPLEMENTATION PHASE

Evaluation and Optimization (Month 16-17)

The final phase involves evaluating the system's performance and making necessary optimizations. This includes:

  • Collecting and analyzing performance data against KPIs.
  • Gathering user feedback and identifying areas for improvement.

  • Implementing optimizations to enhance system functionality and user experience.

Timeline Chart

S.N Phase Key Activities Year-2024 Year- 2025
Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
1 Needs Assessment Surveys, interviews, workflow analysis
2 Planning Project plan, team formation
3 Vendor Selection Evaluate and select vendors
4 System Design & Customization Customize HMIS, design interfaces
5 Pilot Testing Test in selected departments
6 Training & Change Management Develop and execute training program
7 Full Implementation Roll out HMIS, data migration
8 Evaluation & Optimization Performance evaluation, optimizations

Stakeholder Roles in HMIS Implementation

S.N. Stakeholder Category Roles and Responsibilities
1 Executive Management Primary
  • Approve project funding and resources.
  • Set strategic direction and objectives.
  • Monitor project progress and make high-level decisions.
  • Ensure alignment with organizational goals and ROI.
2 Project Management Office (PMO) Primary
  • Oversee project planning and execution.
  • Coordinate between different stakeholder groups.
  • Manage project timelines, budgets, and resources.
  • Monitor project risks and implement mitigation strategies.
3 Clinical Staff (Doctors, Nurses) Primary
  • Provide input on system requirements and workflows.
  • Participate in pilot testing and provide feedback.
  • Attend training sessions and adapt to new workflows.
  • Ensure accurate and timely data entry into the new system.
4 Administrative Staff Primary
  • Provide input on administrative requirements and workflows.
  • Participate in training and change management activities.
  • Ensure accurate data entry and retrieval.
  • Support data migration and system testing.
5 IT Department Primary
  • Lead the technical implementation of the HMIS.
  • Ensure system integration with existing IT infrastructure.
  • Maintain system security and compliance with regulations.
  • Provide ongoing technical support and troubleshooting.
6 Vendors (HMIS Providers) Primary
  • Supply and customize the HMIS software to meet RHN's needs.
  • Provide training and support for system deployment.
  • Ensure system compliance with HL7 FHIR standards for interoperability.
  • Offer ongoing maintenance and support services.
7 Patients Secondary
  • Provide feedback on patient experience and system usability.
  • Participate in user satisfaction surveys.
  • Engage with patient advisory councils to communicate needs and concerns.
8 Regulatory Bodies (e.g., HIPAA, local health authorities) Secondary
  • Ensure the HMIS complies with relevant healthcare regulations.
  • Conduct audits and compliance checks.
  • Provide guidance on data security and patient privacy standards.
  • Enforce legal requirements and standards.
9 Board of Directors Secondary
  • Provide strategic oversight and governance.
  • Approve major project milestones and deliverables.
  • Ensure the project aligns with long-term organizational goals.
  • Review compliance and financial impact reports.
10 Consultants (External Experts) Secondary
  • Offer expert advice on best practices and implementation strategies.
  • Assist in system design, customization, and integration.
  • Conduct training sessions and workshops.
  • Provide an external perspective on project risks and opportunities.

References:

  • Bates, D. W., & Gawande, A. A. (2003). "Improving safety with information technology." New England Journal of Medicine, 348(25), 2526-2534
  • Kruse, C. S., Kristof, C., Jones, B., Mitchell, E., Martinez, A., & Palmer, R. (2016). "Barriers to electronic health record adoption: a systematic literature review." Journal of Medical Systems, 40, 252.
  • Gagnon, M. P., Desmartis, M., Labrecque, M., Car, J., Pagliari, C., Pluye, P., ... & Lgar, F. (2012). "Systematic review of factors influencing the adoption of information and communication technologies by healthcare professionals." Journal of Medical Internet Research, 14(1), e21.

5.Address Key Organizational Components

5.1. Governance Structures:

At Riverside Healthcare Network (RHN), effective governance is essential to ensure the successful implementation and operation of the Health Management Information System (HMIS). The governance structure will include the following key committees and roles:

Steering Committee:

Purpose: Provides strategic oversight and decision-making authority for the HMIS implementation project.

Composition: Executive management, department heads (clinical and administrative), IT leadership.

Responsibilities:

  • Approve project scope, budget, and major milestones
  • Resolve escalated issues and provide guidance on strategic alignment.
  • Monitor project progress and ensure adherence to timelines

Project Management Committee (PMC):

Purpose: Acts as the central coordinating body responsible for project planning, execution, and monitoring.

Composition: Project manager, IT project team members, representatives from key departments.

Responsibilities:

  • Develop and maintain project plans, schedules, and resource allocations.
  • Facilitate communication and collaboration among stakeholders.
  • Manage risks, issues, and dependencies to ensure timely resolution.

Decision-Making Processes: Clear decision-making processes will be established to ensure efficient progress and alignment with organizational goals:

  • Major decisions regarding HMIS customization, budget adjustments, and timeline revisions will be reviewed and approved by the Steering Committee.
  • Regular meetings and status updates will be conducted to provide transparency and accountability in decision-making.

5.2. Policy

RHN is committed to safeguarding patient information and ensuring compliance with regulatory requirements. The following policies will be formulated and implemented:

  1. Data Handling Policy:
    • Define procedures for data collection, storage, access, and sharing within the HMIS.
    • Specify roles and responsibilities for maintaining data integrity and accuracy.
    • Ensure compatibility with existing policies and standards.
  2. Privacy Policy:
    • Outline guidelines for protecting patient confidentiality and privacy rights.
    • Detailed protocols for obtaining patient consent and handling sensitive information.
    • Establish procedures for responding to privacy breaches and notifying affected parties.
  3. Security Policy:
    • Implement measures to safeguard against unauthorized access, data breaches, and cyber threats.
    • Require adherence to industry best practices and compliance with HIPAA and other relevant regulations.
    • Conduct regular security audits and assessments to identify vulnerabilities and mitigate risks.

5.3. Social Components

Effective stakeholder engagement is crucial to the success of the HMIS implementation. RHN will implement a comprehensive plan to engage stakeholders throughout the project lifecycle:

  1. Communication Strategy:
    • Communication plan will be developed to inform stakeholders about the HMIS project objectives, benefits, and timelines.
    • Multiple channels will be utilized (e.g., newsletters, town hall meetings, intranet) to ensure widespread dissemination of information.
  2. Training and Change Management:
    • Tailored training programs will be developed for different user groups (clinical staff, administrative personnel, IT support) to promote system proficiency and adoption.
    • Change management strategies will be incorporated to address resistance and facilitate smooth transitions in workflows and processes.
    • Constant support and resources will be provided to assist users in adapting to the new system and maximizing its benefits.

5.4. Legal Component

To ensure compliance with healthcare regulations and data protection laws, RHN will take the following steps:

  1. Comprehensive Audit:
    • Thorough audit will be conducted of current practices and systems to identify gaps in compliance with HIPAA, HL7 FHIR standards, and other regulatory requirements.
    • Findings will be documented and an action plan will be developed to address identified issues.
  2. Regulatory Alignment:
    • Collaboration with legal advisors and regulatory bodies will be done to interpret and implement regulations relevant to HMIS implementation.
    • Ongoing communication will be maintained to stay updated on regulatory changes and requirements.
  3. Documentation and Reporting:
    • Detailed documentation will be maintained of compliance efforts, including policies, procedures, and audit reports.
    • Regular compliance reports will be prepared for internal review and external audits to demonstrate adherence to regulatory standards.

5.5. Organizational Component

RHN will establish clear roles, structures, and workflows to support the implementation and operation of the HMIS:

  1. Organizational Roles:
    • New roles will be defined responsible for specific aspects of HMIS management and support.
    • Responsibilities and reporting lines will be created to ensure accountability and efficient workflow management.
  2. Structural Design:
    • Organizational structures will be designed to facilitate communication, collaboration, and decision-making across departments and hierarchical levels.
    • Cross-functional teams will be formed to promote integration and alignment of HMIS objectives with overall organizational goals.
  3. Workflow Optimization:
    • Workflows will be redesigned to streamline operations, reduce redundancy, and enhance efficiency.
    • Workflows are adapted to accommodate future changes and technological advancements.

References:

  • https://link.springer.com/chapter/10.1007/978-3-030-64697-4_15

6. Propose Solutions and Tools

In the context of Riverside Healthcare Network (RHN), the Hybrid HIE model will be employed to ensure robust data sharing, security, and workflow efficiency. This model combines the advantages of both centralized and decentralized (federated) HIE approaches, tailored to meet RHN's specific needs.

Implementation of Hybrid Health Information Exchange (HIE) Model

The diagram above illustrates the Hybrid Health Information Exchange (HIE) model for Riverside Healthcare Network (RHN). Here's a detailed explanation of the flow:

Centralized Repository:

  1. Data Aggregation:
    • A master data repository will be established at RHN's main hospital. This repository will consolidate patient data from various departments and affiliated clinics.
    • The centralized system will house critical patient information, including demographic details, medical histories, treatment plans, lab results, and imaging data.
  2. Access Control:
    • Implement strict access controls to ensure that only authorized personnel can access sensitive patient information. Role-based access will be established to maintain data confidentiality and integrity.
    • Centralized access controls will help in monitoring and auditing data access, ensuring compliance with HIPAA and other regulatory standards.

Decentralized Nodes:

  1. Local Data Storage:
    • Individual clinics and departments within RHN will maintain control over their own data, storing it locally in their respective systems.
    • Each node (clinic or department) will have its own EHR system, which will be integrated with the central repository for seamless data exchange.
  2. Secure Data Exchange:
    • Secure, on-demand data exchange mechanisms will be established between decentralized nodes and the central repository. Data will be exchanged using secure protocols that comply with HL7 FHIR standards.
    • A federated query system will be employed, allowing healthcare providers to retrieve specific patient data from the central repository or other nodes as needed.

Hybrid HIE Architecture Specific to RHN:

  1. Middleware Integration:
    • Middleware solutions will be developed to facilitate communication between centralized and decentralized components. These solutions will act as intermediaries, ensuring data compatibility and seamless integration.
    • Middleware will handle data translation, mapping, and transformation, enabling interoperability between different systems within RHN.
  2. Interoperability Standards:
    • All data exchanges will adhere to HL7 FHIR standards to maintain consistency and reliability. This ensures that data from different systems can be accurately interpreted and utilized.
    • FHIR-based APIs will be developed to enable secure and efficient data sharing across the network.
  3. Data Security:
    • Advanced security measures will be implemented to protect data during transmission and storage. Encryption, secure access protocols, and regular security audits will be standard practices.
    • A robust incident response plan will be in place to address any security breaches or vulnerabilities promptly.

Process Specific to RHN

Patient Data Management:

  • When a patient visits any clinic within RHN, their data will be captured and stored locally in the clinic's EHR system.
  • This data will be periodically synchronized with the central repository to ensure a comprehensive patient record is maintained.

Care Coordination:

  • Healthcare providers across different clinics and departments will have access to the central repository, allowing them to view a complete patient history.
  • For instance, if a patient is referred from a primary care clinic to a specialist at the main hospital, the specialist can access the patient's full medical history from the centralized repository, ensuring informed decision-making.

Data Retrieval:

  • In scenarios where a healthcare provider needs specific data not stored locally, a federated query can be initiated. The query will retrieve the required data from the relevant node or central repository in real-time.
  • This ensures that providers always have access to the most up-to-date and relevant information, regardless of where the data is stored.

Data Security and Compliance:

  • Role-based access controls will be enforced to ensure that data access is restricted based on user roles and responsibilities.
  • Regular security audits and compliance checks will be conducted to ensure adherence to HIPAA and other regulatory requirements.

Workflow Integration:

  • Workflows across RHN will be standardized to align with the new HMIS. This includes training staff on new processes and ensuring that data entry and retrieval procedures are streamlined.
  • For example, standardized templates and forms will be used across all clinics and departments to ensure consistency in data capture and reporting.

By employing the Hybrid HIE model, RHN will achieve a balance between centralized data management for comprehensive patient records and decentralized control for local data management and privacy. This approach will enhance data sharing, improve care coordination, and ensure robust security and compliance across the healthcare network.

References:

  • https://intellisoft.io/hie-health-information-exchange-a-complete-guide/#:~:text=The%20hybrid%20HIE%20model%20merges,to%20control%20their%20data%20storage.
  • https://youtu.be/ciWSUMvfoF4?si=8NqQHWf-mP7B2lh6
  • https://rhapsody.health/resources/health-information-exchange-helpful-information/
  • HIPAA Journal. (2020). "Healthcare Data Security Challenges and Solutions.
  • ISO. (2013). "ISO/IEC 27001:2013 - Information technology Security techniques Information security management systems Requirements."

7. Build a Business Case

Justification for Investment

Investing in a new Health Management Information System (HMIS) for Riverside Health Network (RHN) is essential for several reasons:

  1. Improved Patient Care: The new HMIS will enhance data sharing and interoperability across departments, resulting in comprehensive and up-to-date patient records. This leads to better-informed clinical decisions, timely interventions, and ultimately, improved patient outcomes.
  2. Operational Efficiency: Streamlining workflows and reducing administrative burdens will lower operational costs. Efficient data management and workflow automation will allow healthcare professionals to spend more time on patient care and less on paperwork.
  3. Regulatory Compliance: Modernizing the HMIS ensures compliance with HIPAA and other regulatory requirements, minimizing the risk of legal penalties and safeguarding RHN's reputation.
  4. Data Security: Upgrading to a system with advanced security protocols will protect sensitive patient information from breaches and unauthorized access, reducing the risk of financial and legal repercussions.
  5. Cost Savings: Reducing redundant diagnostic tests and improving resource utilization will result in significant cost savings. Additionally, operational efficiencies and reduced administrative overheads will further enhance financial stability.

Cost Analysis

The cost analysis for implementing the new HMIS at RHN encompasses several components:

  1. Pre-Implementation Phase:
    • Needs Assessment: $100,000
    • Planning: $150,000
    • Vendor Selection: $50,000
  2. Implementation Phase:
    • System Design and Customization: $500,000
    • Pilot Testing: $200,000
    • Training and Change Management: $300,000
    • Full Implementation: $700,000
  3. Post-Implementation Phase:
    • Evaluation and Optimization: $100,000
  4. Annual Maintenance and Support:
    • Technical Support: $200,000 per year
    • System Upgrades and Enhancements: $150,000 per year

The total estimated cost for the first year, including implementation and initial maintenance, is approximately $2.3 million. Subsequent annual costs are estimated at $350,000 for maintenance and support.

Potential Risks and Mitigation Strategies

Implementing a new HMIS involves several potential risks, which can be mitigated through strategic planning and proactive measures:

  1. Technical Challenges:
    • Risk: Integration issues with existing systems and unexpected technical difficulties.
    • Mitigation: Conduct thorough pilot testing and work closely with experienced vendors to ensure compatibility and smooth integration.
  2. User Resistance:
    • Risk: Resistance from staff due to changes in workflows and fear of new technology.
    • Mitigation: Implement comprehensive training programs and change management strategies to ease the transition and address concerns.
  3. Data Migration Issues:
    • Risk: Data loss or corruption during the migration process.
    • Mitigation: Perform multiple rounds of testing and validation to ensure data integrity. Have a robust backup and recovery plan in place.
    • Encrypt data both in transit and at rest. This safeguards data from unauthorized access even if physical devices are compromised or data is intercepted during transmission.

  1. Regulatory Compliance:
    • Risk: Non-compliance with healthcare regulations.
    • Mitigation: Engage legal advisors and conduct regular compliance audits to ensure adherence to regulatory standards.
    • Block-chain offers an immutable and decentralized way to store and secure healthcare data. Patient records stored on a block-chain can enhance data integrity and security.
    • Implement strict access control mechanisms to ensure that only authorized personnel can access patient data. Role-based access control (RBAC) can help restrict access based on job roles.
  2. Cost Overruns:
    • Risk: Project costs exceeding the budget.
    • Mitigation: Establish a detailed project plan with clear milestones and contingency budgets. Regularly monitor expenses and adjust plans as needed.

References:

1.https://youtu.be/UQP5MmCAQ3Y

2.https://www.process.st/templates/business-case-analysis-template/

3.https://medium.com/@ejamil_62933/fortifying-the-future-ensuring-security-in-health-management-information-systems-hmis-82d335c71c00

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project Management A Systems Approach to Planning Scheduling and Controlling

Authors: Harold Kerzner

10th Edition

978-047027870, 978-0-470-5038, 470278706, 978-0470278703

More Books

Students also viewed these General Management questions

Question

=+How were those subcategories defi ned?

Answered: 1 week ago