Car PlantCar Plant (CPCP) designs and produces automotive parts. In 20172017, actual manufacturing overhead is $ 318 comma 000$318,000. CP'sCP's simple costing system allocates manufacturing
Car PlantCar Plant
(CPCP)
designs and produces automotive parts. In
20172017,
actual manufacturing overhead is
$ 318 comma 000$318,000.
CP'sCP's
simple costing system allocates manufacturing overhead to its three customers based onmachine-hours and prices its contracts based on full costs. One of its customers has regularly complained of being charged noncompetitive prices, so
CP'sCP's
controller
DevonDevon
EverettEverett
realizes that it is time to examine the consumption of overhead resources more closely. He knows that there are three main departments that consume overhead resources: design, production, and engineering. Interviews with the department personnel and examination of time records yield the following detailed information:
$
$
Requirement 1. Compute the manufacturing overhead allocated to each customer in
20172017
using the simple costing system that uses machine-hours as the allocation base.
Determine the formula needed to calculate overhead using the simple costing method and then calculate
CPCP's
manufacturing overhead rate for
20172017.
(Round your answer to the nearest cent.)
Total manufacturing overhead | Total machine hours | = | Manufacturing overhead rate | ||
$318,000 | 5,000 | = | $63.60 | per machine hour |
Calculate the overhead allocated to each customer using the simple costing method. (Round your answers to the nearest whole dollar.)
| Machine | Overhead |
Customer | Hours Used | Allocated |
United Motors | 220 | $13,992 |
Anthony Motors | 3,300 | $209,880 |
Herman Auto | 1,480 | $94,128 |
Requirement 2. Compute the manufacturing overhead allocated to each customer in
20172017
using department-based manufacturing overhead rates. (Abbreviations used: Dept. = Department.)
Determine the formula used to calculate the department-based manufacturing overhead rates:
| Manufacturing overhead per dept. | Total hours per dept. | = | Manufacturing overhead rate by dept. |
|
CPCP's
20172017
manufacturing overhead rates by department are as follows:
| Manufacturing Overhead Rate | ||
Department | (by Department) | ||
Design | $95 | per | CAD-design hour |
Engineering | $75 | per | engineering hour |
Production | $50 | per | machine hour |
Calculate the overhead allocated to each customer, by department, using the departmental manufacturing overhead rates calculated in the previous step. Calculate the total overhead cost for each department and each customer.
| United | Anthony | Herman |
|
Department | Motors | Motors | Auto | Total |
Design |
|
|
|
|
Engineering |
|
|
|
|
Production |
|
|
|
|
Total |
|
|
|
|
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started