Caramel Industries uses job order costing. Total costs in Job 211 500,000.00 Total units produced in Job 211 25,000.00 1,000 of the 25,000 units didn't
Caramel Industries uses job order costing.
Total costs in Job 211 500,000.00
Total units produced in Job 211 25,000.00
1,000 of the 25,000 units didn't pass inspection.
500 could be reworked. The cost to rework was: 2,400
500 couldn't be reworked.
There was also some scrap resulting from the job. The scrap had a resale value of 3,675.
Part A: Determine the final cost per unit in Job 211 IF:
Rework was not caused by the job.
The spoiled units were all considered normal and the spoilage was not specific to the job. They could be sold for a discounted prioce of $15 per unit.
The scrap was recognized at the time of production. The scrap was specific to the job and was considered significant.
Part B: Determine the final cost per unit in Job 211 IF
Rework was caused by the job.
The spoiled units were all considered normal but the spoilage was specific to the job. They could be sold for a discounted prioce of $15 per unit.
The scrap was recognized at the time of sale. The scrap was considered significant but was not specific to the job.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started