Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Case Analysis 1 Wolseley's dilemma of Traditional Costing versus Activity Based Costing Wolseley Manufacturing Corporation manufactures various electronics products and follows a traditional (ob-order) costing

image text in transcribed
image text in transcribed
image text in transcribed
Case Analysis 1 Wolseley's dilemma of Traditional Costing versus Activity Based Costing Wolseley Manufacturing Corporation manufactures various electronics products and follows a traditional (ob-order) costing system in which it applies manufacturing overhead to its products using a predetermined overhead rate based on direct labour-hours (DLHS). The company has two products, C18R and G1SR, about which it has provided the following data: GIR CHAR $100 58.40 Direct Direto per The company's estimated total manufacturing overhead for year is $1.464.480 and the company's estimated total direct Labour-hours for the year is 24,000. The company is considering using a variation of activity based costing to determine its unit product costs for external reports. Data for this proposed activity-based costing system appear below Activities and Activity Men Sapporti direct Stitches Estimated Cher 383.000 Acthys Supporting de labor GI 12,000 Total 34 340 04 Mike, who is the controller of the Company, is currently overseeing the project to switch from traditional costing to Activity-Based costing. He is in a meeting with the Cost Accountant of the company. The Controller goes over the data and makes the following comments "Activity-Based Costing is a revelation in the modern-day world of manufacturing Industry. If we are correctly able to categorize the various nature of work into essential levels then we can dramatically trace the precise nature of the overheard activity." Jacob, the Cost Accountant, quips, how can we classify those levels of activities? Do we have some mechanism to identify them?" Jacob, the Cost Accountant, quips, "how can we classify those levels of activities? Do we have some mechanism to identify them?" Mike responds, "Yes! We do." Jacob then laments the pitfalls of the job order costing system, The production report will be out soon and usually, the allocation bases (including overhead allocations in job-order costing systems) are not entirely accurate." Mike, with a pause, That is exactly why we may eventually need to switch to the Activity-Based costing though it is comparatively difficult to implement with the cost and operations limitations involved in it." Jacob adds, "Another consideration to evaluate is the relationship between the cost of maximum (budgeted) capacity and idle capacity, since the company is likely to operate at maximum capacities during the time of peak demand. Moreover, our long-term goals of stable cost predictions and waste minimizations should also be kept in mind." "Alright! Let us calculate and analyze the quantitative and qualitative aspects of the data and other factors we have discussed in the meeting today and prepare the preliminary report for the CEO by this weekend. Mike with the final comments! f. The use of which activity level, budgeted (same as expected) or maximum capacity, is consistent with ABC? Explain. g. How might the use of ABC based on maximum capacity activity level enhance a firm's ability to compete on price? Explain. h. If you were to recommend one of the costing systems for Wolseley Inc., which one would you pick and why

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Integrated Auditing Of ERP Systems

Authors: Yusufali F. Musaji

1st Edition

0471235180, 978-0471235187

More Books

Students also viewed these Accounting questions

Question

Let B = AT A. Show that bij = aiTaj.

Answered: 1 week ago