Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Case Study 5-2 Bicycle enthusiasts not only love the ride their bikes provide but also are often willing to pay for newer technology, especially when

Case Study 5-2

Bicycle enthusiasts not only love the ride their bikes provide but also are often willing to pay for newer technology, especially when it will increase their speed or comfort. Innovating new technologies for bikes is only half the battle for bike manufacturers. Designing the process to manufacture the bikes is often the more daunting challenge.

Consider the case of Santa Cruz Bicycles. It digitally designs and builds mountain bikes and tests them under the most extreme conditions to bring the best possible product to its customers. A few years back, the company designed and patented the Virtual Pivot Point (VPP) suspension system, a means to absorb the shocks that mountain bikers encounter when on the rough terrain of the offroad ride. One feature of the new design allowed the rear wheel to bounce 10 inches without hitting the frame or seat, providing shock absorption without feeling like the rider was sitting on a coiled spring.

The first few prototypes did not work well; in one case, the VPP joint's upper link snapped after a quick jump. The experience was the motivation for a complete overhaul of the design and engineering process to find a way to go from design to prototype faster. The 25person company adopted a similar system used by large, global manufacturers: product life cycle management (PLM) software.

The research and development team had been using computeraideddesign (CAD) software, but it took seven months to develop a new design, and if the design failed, starting over would be the only solution. This design approach was a drain not only on the company's time but also on its finances. The design team found a PLM system that helped members analyze and model capabilities in a much more robust manner. The team used simulation capabilities to watch the impact of the new designs on rough mountain terrain. The software tracks all the variables the designers and engineers need so they can quickly and easily make adjustments to the design. The new system allows the team to run a simulation in a few minutes, representing a very large improvement over their previous design software, which took seven hours to run a simulation.

The software was just one component of the new process design. The company also hired a new master frame builder to build and test prototypes in house and invested in a vansize machine that can fabricate intricate parts for the prototypes, a process the company previously outsourced. The result was a significant decrease in its designtoprototype process. What once averaged about 28 months from start of design to shipping of the new bike now takes 12 to 14 months.

Read case Study 5-2: Santa Cruz (SC) Bicycles and answer the question posed below:

List the three factors that came together for Santa Cruz Bicycles to make the changes it did.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project Management in Practice

Authors: Samuel J. Mantel Jr., Jack R. Meredith, Sco

4th edition

470533013, 978-0470533017

More Books

Students also viewed these General Management questions