Case Study-Quality Associates, Inc. Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their

Case Study-Quality Associates, Inc.

Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their manufacturing processes. In one particular application, a client gaveQuality Associates a sample of 800 observations taken during a time in which that client's process wasoperating satisfactorily. The sample standard deviation for these data was .21; hence, with so much data, the population standard deviation was assumed to be .21. Quality Associates then suggested that random samples of size 30 be taken periodically to monitor the process on an ongoing basis. By analyzing the new samples, the client could quickly learn whether the process was operating satisfactorily. When the process was not operating satisfactorily, corrective action could be taken to eliminate the problem. The design specification indicated the mean for the process should be 12. The hypothesis test suggested by Quality Associates follows.

H0: =12

Ha: 12

Corrective action will be taken anytime H0 is rejected.

The following samples were collected at hourly intervals during the first day of operation of the new statistical process control procedure. These data are available in the data set Quality.

Sample 1,Sample 2, Sample 3, Sample 4

11.55, 11.62, 11.91, 12.02

11.62, 11.69, 11.36, 12.02

11.52, 11.59, 11.75, 12.05

11.75, 11.82, 11.95, 12.18

11.90, 11.97, 12.14 12.11

11.64, 11.71, 11.72, 12.07

11.80, 11.87, 11.61, 12.05

12.03, 12.10, 11.85, 11.64

11.94, 12.01, 12.16, 12.39

11.92, 11.99, 11.91, 11.65

12.13, 12.20, 12.12, 12.11

12.09, 12.16, 11.61, 11.90

11.93, 12.00, 12.21, 12.22

12.21, 12.28, 11.56, 11.88

12.32, 12.39, 11.95, 12.03

11.93, 12.00, 12.01, 12.35

11.85, 11.92, 12.06, 11.77

12.16, 12.23, 11.82, 12.20

11.77, 11.84, 12.12, 11.79

12.00, 12.07, 11.60, 12.30

12.04, 12.11, 11.95, 12.27

11.98, 12.05, 11.96, 12.29

12.30, 12.37, 12.22, 12.47

12.18, 12.25, 11.75, 12.03

11.97, 12.04, 11.96, 12.17

12.17, 12.24, 11.95, 11.94

11.85, 11.92, 11.89, 11.97

12.30, 12.37, 11.88, 12.23

12.15, 12.22, 11.93, 12.25

Managerial Report

1 (20 points). Conduct a hypothesis test in R for each sample at the .01 level of significance and determine what action, if any, should be taken. Provide the test statistic and p-value for each test.

2 (20 points). Compute the standard deviation for each of the four samples in R. Does the assumption of .21 for the population standard deviation appear reasonable?

3 (30 points). In RCompute limits for the sample mean around = 12 such that, as long as a new samplemean is within those limits, the process will be considered to be operating satisfactorily. If exceeds the upper limit or if is below the lower limit, corrective action will be taken. These limits are referred to as upper and lower control limits for quality control purposes.

4 (30 points). Discuss the implications of changing the level of significance to a larger value. What mistake or error could increase if the level of significance is increased?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Transportation A Global Supply Chain Perspective

Authors: John J. Coyle, Robert A. Novak, Brian Gibson, Edward J. Bard

8th edition

9781305445352, 1133592961, 130544535X, 978-1133592969

More Books

Students also viewed these Mathematics questions