Commercial trucks begin to arrive at a seaport entry plaza at 7:45 am, at the rate of Lambda(t) = 5 - 0.03t (where Lambda(t) is
Commercial trucks begin to arrive at a seaport entry plaza at 7:45 am, at the rate of Lambda(t) = 5 - 0.03t (where Lambda(t) is in veh/min and t is in minutes). The plaza opens at 8:00 am. For the first 15 minutes, one processing booth is open. After the first 15 minutes until the queue clears, two processing booths are open. Each booth processes trucks at a uniform rate of two trucks per minute. What is the average delay per vehicles, the total delay, and the average queue length?
Selected Answer: Total delay: 8241.99 min Avg delay/vehicle: 21.65 min/veh Avg queue length: 70.05 veh Response Feedback: CORRECT!!!! Great job :D
How to draw a diagram and solve based on it. I solved it, but I want to know how to draw a diagram. Please do not tell as an explanation; I do not like it. Please draw a diagram and explain how you solved it, but the answers should be the same as above.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started