Company wants to be establish a Kanban system for a production line to control its WIP level, However the company still needs to determine
Company wants to be establish a Kanban system for a production line to control its WIP level, However the company still needs to determine main parameters of the interbled Kanban system such as the container size, the material handling in use and the number of rquired Kanban's. The line will produce units with 15% Sefety sto factor and the annual inventory holding cost is $0.75 per unit of WIP. Give the following information find required Kanban ", farmeters "optimal values" (the company operators 8 hr/day, 7 days week) Maximum Load size ( a option - Electrical forklift - Push Cart Fuel Forklift - Belt nnual cost ($) 5500 3500 4500 6500 Cost per trip 0.15 0.25 0.10 0.25 75 20 25 loo what is the best alternative material handling equipment (with its Container size) to use given that 150 000 units are required per year?
Step by Step Solution
★★★★★
3.58 Rating (180 Votes )
There are 3 Steps involved in it
Step: 1
Here we want to determine the optimal values for the Kanban system parameters we need to calculate the following Container Size C This is the number o...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started