Question

1 Approved Answer

Complete Case 7.3 Trans LAN Project in Larson and Gray by responding to questions 1, 2, and 3. Combine items 1 and 2 into a

Complete Case 7.3 Trans LAN Project in Larson and Gray by responding to questions 1, 2, and 3.  Combine items 1 and 2 into a single Risk Assessment Form (see Figure 7.6 in Larson and Gray) and use Microsoft Excel to complete this item. Use Microsoft Excel for the Risk Response Matrix (see Figure 7.8 in Larson and Gray) for question 3.  Note that additional items may be added to the Risk Assessment Form and the Risk Response Matrix.

In addition to the requested items in the case, complete the following:

  1. Based on the risks that you identified on the Risk Assessment Form, create a Risk Severity Matrix (see Figure 7.7 in Larson and Gray). Note that additional information beyond the information shown in Figure 7.7 may be provided. Use Microsoft Excel to complete this item.
  2. Make any assumptions and document them as necessary to complete the aforementioned items.

 

Trans LAN Project

Trans Systems is a small information system consulting firm located in Meridian, Louisiana. Trans has just been hired to design and install a local area network (LAN) for the city of Meridian’s social welfare agency. You are the manager for the project, which includes one Trans professional and two interns from a local university. You have just finished a preliminary scope statement for the project (see below). You are now brainstorming potential risks associated with the project.

.1. Identify potential risks associated with this project. Try to come up with at least five different risks.

2. Use a risk assessment form similar to Figure 7.6 to analyze identified risks.

3. Develop a risk response matrix similar to Figure 7.8 to outline how you would deal with each of the risks. 236 Chapter 7 Managing Risk

 

PROJECT SCOPE STATEMENT

PROJECT OBJECTIVE

To design and install a new local area network (LAN) within one month with a budget not to exceed $90,000 for the Meridian Social Service Agency with minimum disruption to ongoing operations.

DELIVERABLES∙

Twenty workstations and twenty laptop computers.

∙ Server with dual-core processors.

∙ Two color laser printers.

∙ Windows R2 server and workstation operating system (Windows 10).

∙ Migration of existing databases and programs to new system.

∙ Four hours of introduction training for client’s personnel.

∙ Sixteen hours of training for client network administrator.

∙ Fully operational LAN system.

 

MILESTONES

  1. Hardware January 22.

2. Setting users’ priority and authorization January 26.

3. In-house whole network test completed February 1.

4. Client site test completed February 2.

5. Training completed February 16.

 

TECHNICAL REQUIREMENTS

1. Workstations with 17-inch flat panel monitors, dual-core processors, 4 GB RAM, 8X DVD+RW, wireless card, Ethernet card, 500 GB hard drive.

2. Laptops with 12-inch display monitor, dual-core processors, 2GB RAM, 8X DVD+RW, wireless card, Ethernet card, 500 GB hard drive and weigh less than 4½ lbs.

3. Wireless network interface cards and Ethernet connections.

4. System must support Windows 11 platforms.

5. System must provide secure external access for field workers.

LIMITS AND EXCLUSIONS

1. On-site work to be done after 8:00 p.m. and before 7:00 a.m. Monday through Saturday.

2. System maintenance and repair only up to one month after final inspection.

3. Warranties transferred to client.

4. Only responsible for installing software designated by the client two weeks before the start of the project.

5. Client will be billed for additional training beyond that prescribed in the contract.

CUSTOMER REVIEW

Director of the city of Meridian’s Social Service Agency



Step by Step Solution

3.51 Rating (151 Votes )

There are 3 Steps involved in it

Step: 1

Risk management is a significant piece to any project Risk management is more a proactive methodology than a receptive one which Diminishes amazements and unfortunate results Project directors are set ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Mergers, Acquisitions and Other Restructuring Activities

Authors: Donald DePamphilis

8th edition

9780128024539, 128013907, 978-0128013908

More Books

Students also viewed these Accounting questions

Question

6. b is: (a) 2.049 (b) 0.31928 (c) 0.01659 (d) None of these

Answered: 1 week ago

Question

Find maxmia minima using send derivative x^4-x^3+10

Answered: 1 week ago

Question

5. What is the season-of-birth effect?

Answered: 1 week ago

Question

4. What are the effects of SSRIs?

Answered: 1 week ago