Answered step by step
Verified Expert Solution
Question
1 Approved Answer
COMPLETE FULL CALCULATIONS, CORRECT ANSWERS, AND ALL PARTS PLEASE! Do not say You can use a linear programming solver or software to find the optimal
COMPLETE FULL CALCULATIONS, CORRECT ANSWERS, AND ALL PARTS PLEASE!
Do not say You can use a linear programming solver or software to find the optimal solution ONLY CORRECT ANSWERS
I need to compare my answers!
The port of Lajitas has three loading docks. The distance (in meters) between the loading docks is given in the following table. no cargo. However, ship 1 has cargo that must be loaded onto the other two ships. The number of tons that must be transferred are as follows. the objective function. Only include the nonzero terms. Each of the 12 nonzero terms in the objective function is a quadratic term, or the product of two variables.) Let Xij=1 if tanker i is assigned loading dock j and 0 if not. Tanker 1 =1 Tanker 2 =1 Tanker 3 =1 Since there are three tankers and three loading docks each loading dock must be assigned to a tanker. These constr Dock 1 =1 Dock 2 =1 Dock 3 =1 The complete objective function is found by considering the result of assigning tankers to docks and the product of MIN=()x11x22+()x11x32+()x11x33+()x12x21+()x12x23+()x12x31+()x12x33+()x13x21+()x13x22+()x13x31+()x13x32 Complete the solution to the model. Let Xij=1 if tanker i is assigned loading dock j and 0 if not. x11=x12=x13=x21=x22=x23=x31=x32=x33== Objective value Thus tanker 1 should be assigned to dock , tanker 2 to dock and tanker 3 to dockStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started