Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

compressor. 3 . You have been asked to estimate the cost of 1 0 0 prefabricated structures to be sold to a local school district.

compressor.
3. You have been asked to estimate the cost of 100 prefabricated structures to be sold to a local school district. Each structure provides 1,000 square feet of floor space, with 8-feet ceilings. In 1999, you produced 70 similar structures consisting of the same materials and having the same ceiling height, but each provided only 800 square feet of floor space. The material cost for each structure was $25,000 in 1999, and the cost capacity factor is 0.65. The cost index values for 1999 and 2006 are 200 and 289, respectively. The estimated manufacturing cost for the first 1,000-square-foot structure is $12,000. Assume a learning curve of 88% and use the cost of the 50th structure as your standard time for estimating manufacturing cost. Estimate the total material cost and the total manufacturing cost for the 100 prefabricated structures.
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Manufacturing Strategy Texts And Cases

Authors: Terry Hill

2nd Edition

0333762223, 9780333762226

More Books

Students also viewed these General Management questions