Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Compute Lead Time Bhojraj Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two

image text in transcribed

Compute Lead Time Bhojraj Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 60 parts. A part requires 4 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 8 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 6 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Traditional Philosophy Lean Manufacturing Philosophy Value-added time 11 min 11 min Non-value-added time 641 X min 11 X min Total lead time 652 X min 22 X min Value-added ratio (as a percent) 1.72 X % 50 X %

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Intermediate Accounting

Authors: Beechy Thomas, Conrod Joan, Farrell Elizabeth, McLeod Dick I

Volume 1, 6th Edition

1259103250, 978-1259103254, 978-0071339476

More Books

Students also viewed these Accounting questions