Question
Compute the early, late, and slack times for the activities in the network that follows, assuming a time-constrained network. Note which activities are critical, and
Compute the early, late, and slack times for the activities in the network that follows, assuming a time-constrained network. Note which activities are critical, and determine the critical time-constrained project duration. Note: Recall that in the schedule resource load chart the time-constrained scheduling interval (ES through LF) has been shaded. Any resource scheduled beyond the shaded area will delay the project. "TP" stands for time period. What is the time-constrained length of the project without regard to resources? Time-constrained length of the project ________
Assume you have only four resources and you are using software that schedules projects by the parallel method and following heuristics. Schedule only one period at a time! Minimum slack Smallest duration Lowest identification number Keep a log of each activity change and update you make each periode.g., period 01, 12, 23, etc.). The log should include any changes or updates in ES, EF, and slack times each period, activities scheduled, and activities delayed. (Hint: Remember to maintain the technical dependencies of the network.) Use the resource load chart to assist you in scheduling. List the order in which you scheduled the activities of the project
Order Activity
First. _____
Second _____
Third. _____
Fouth. ______
Fifth ______
Sixth. _______
Recompute your slack for each activity given your new schedule. What is the slack for: Activity 1
Activity 2
Activity 3
Activity 4
Activity 5
What is the length of the project when resources are considered? Length of the project ______
Legend ES ID EF SLK RES SLK LS DUR LF 0 1 1 3 3 4 1 4 0 N 6 1 WIN 4 O 3 3 4 1 5 5 Schedule resource load chart with ES and slack updates ID 1 2 3 4 5 6 Resource Duration ESLF SLTP 1 TP 2 TP 3 TP 4 TP 5 TP 6 TP 7 TP 8 TP9 TP 10 TP 11 TP 12 TP 13 TP 14 TP 15 3 3 0 5 2 1 4 0 5 1 1 5 0 5 0 1 4 4 9 1 3 4 5 9 0 2 3 12 0 Resources scheduled Resources available 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Olol lo 4 Legend ES ID EF SLK RES SLK LS DUR LF 0 1 1 3 3 4 1 4 0 N 6 1 WIN 4 O 3 3 4 1 5 5 Schedule resource load chart with ES and slack updates ID 1 2 3 4 5 6 Resource Duration ESLF SLTP 1 TP 2 TP 3 TP 4 TP 5 TP 6 TP 7 TP 8 TP9 TP 10 TP 11 TP 12 TP 13 TP 14 TP 15 3 3 0 5 2 1 4 0 5 1 1 5 0 5 0 1 4 4 9 1 3 4 5 9 0 2 3 12 0 Resources scheduled Resources available 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Olol lo 4Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started