Question
Consider the following data are available for designing the logistics system: Product: Motor Generator for industrial use, Total annual demand = 5,500 units of motor
Consider the following data are available for designing the logistics system: Product: Motor Generator for industrial use, Total annual demand = 5,500 units of motor generator, Production capacity of a single manufacturing plant = 2,000 units per year (maximum capacity), Potential Location of Manufacturing plants = in Asia (e.g. China, India, Thailand, Vietnam, etc.), Potential Demand Centres are based in Western Europe and North America (USA, Canada and Mexico), Potential Location of Vendors or Raw Material Suppliers are in Asia and North America, Transportation Systems used to transport raw materials, finished product (generators) = trucks, rail line, ships (waterways), Loading and unloading machines used at Warehouses = Fork-Lift machines, conveyors (heavy duty), Total number of end-users or customers (or demand centres) = 5, Maximum Warehouse capacity to hold items (generators) = 1,500 per warehouse per year, Maximum capacity of trucks to transport generators = 25 generators per truck per trip, Maximum capacity of rail line = 150 generators per trip, Maximum capacity of cargo ships = 1,000 generators per trip, Volume of raw materials consumption per unit of generator manufacturing = 3* volume of a generator, Raw materials are carried using the similar modes of transportation, but no warehousing is required, Transportation Cost from raw material supplier to Manufacturer = $3.5 per generator volume by truck, $2.0 per generator volume by rail line, and $1.25 per generator volume by cargo ships, Transportation Cost from Manufacturer to Warehouses = $4.0 per generator by truck, $3.0 per generator by rail line, and $1.50 per generator by cargo ships, Transportation Cost from Warehouses to end-user or customers = $3.0 per generator by truck, $2.0 per generator by rail line, and there are no waterways for cargo ship transport, Assume that the assembly line equipment requirement at the manufacturing plants, raw-material suppliers' sites, and warehouses have already been designed and installed and you do not need to calculate it. Complete the requirement analysis for the above logistics system and determine the resources (both equipment and manpower) required.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started