Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Consider the following data are available for designing the logistics system: Product: Motor Generator for industrial use, Total annual demand = 5,500 units of motor

Consider the following data are available for designing the logistics system: Product: Motor Generator for industrial use, Total annual demand = 5,500 units of motor generator, Production capacity of a single manufacturing plant = 2,000 units per year (maximum capacity), Potential Location of Manufacturing plants = in Asia (e.g. China, India, Thailand, Vietnam, etc.), Potential Demand Centres are based in Western Europe and North America (USA, Canada and Mexico), Potential Location of Vendors or Raw Material Suppliers are in Asia and North America, Transportation Systems used to transport raw materials, finished product (generators) = trucks, rail line, ships (waterways), Loading and unloading machines used at Warehouses = Fork-Lift machines, conveyors (heavy duty), Total number of end-users or customers (or demand centres) = 5, Maximum Warehouse capacity to hold items (generators) = 1,500 per warehouse per year, Maximum capacity of trucks to transport generators = 25 generators per truck per trip, Maximum capacity of rail line = 150 generators per trip, Maximum capacity of cargo ships = 1,000 generators per trip, Volume of raw materials consumption per unit of generator manufacturing = 3* volume of a generator, Raw materials are carried using the similar modes of transportation, but no warehousing is required, Transportation Cost from raw material supplier to Manufacturer = $3.5 per generator volume by truck, $2.0 per generator volume by rail line, and $1.25 per generator volume by cargo ships, Transportation Cost from Manufacturer to Warehouses = $4.0 per generator by truck, $3.0 per generator by rail line, and $1.50 per generator by cargo ships, Transportation Cost from Warehouses to end-user or customers = $3.0 per generator by truck, $2.0 per generator by rail line, and there are no waterways for cargo ship transport, Assume that the assembly line equipment requirement at the manufacturing plants, raw-material suppliers' sites, and warehouses have already been designed and installed and you do not need to calculate it. Complete the requirement analysis for the above logistics system and determine the resources (both equipment and manpower) required.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Management

Authors: Stephen P Robbins, Mary Coulter

11th Edition

9780273752776, 132163845, 273752774, 978-0132163842

More Books

Students also viewed these General Management questions

Question

plot the vector field using matlab E(r)=r21r^

Answered: 1 week ago

Question

Would recipients consider my communication respectful?

Answered: 1 week ago