Question
1 Approved Answer
Consider the following Double S-curve for an agile project, with time ( end of month) on the x-axis, completed scope on the left y-axis, and
Consider the following Double S-curve for an agile project, with time (endof month) on the x-axis, completed scope on the left y-axis, and actual (cumulative) spending on the right y-axis. Assume that each story point averages $1,000 in value and that the plan was to complete 600 story points by the end of May. From the