Consider the following timetabling problem with two types of personnel. The total number of personnel of type 1 is W1 = 3 and the total
Consider the following timetabling problem with two types of personnel. The total number of personnel of type 1 is W1 = 3 and the total number of personnel of type 2 is W2 = 4.
(a) Determine first which type of personnel is the most critical (the tightest). (b) Use the information under (a) to develop a heuristic for this problem with two types of personnel (your heuristic may be a generalization of the FFD heuristic described in Section 9.5). (c) Give a numerical example of bad behavior of your heuristic.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started