Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Cooper River Glass Works (CRGW) produces four different models of desk lamps as shown on the flowchart. The operations manager knows that total monthly demand
Cooper River Glass Works (CRGW) produces four different models of desk lamps as shown on the flowchart. The operations manager knows that total monthly demand exceeds the capacity available for production. Thus, she is interested in determining the product mix which will maximize profits. Each model's price, routing, processing times, and material cost is provided in the flowchart. Demand next month is estimated to be 150 units of model Alpha, 175 units of model Bravo, 250 units of model Charlie, and 200 units of model Delta CRGW operates only one 8 hours shift per day and is scheduled to work 20 days next month (no overtime). Further, each station requires a 10% capacity cushion Click the icon to view the Cooper River Glass Works Flowchart a. Which station is the bottleneck? The bottleneck is with a total load of minutes for the next month. (Enter your response as a whole number) A paced assembly line has been devised to manufacture calculators, as the following data show. Station Work Element Assigned Work Element Time (min) S1 A S2 D, E 27 0.6,0.9 S3 C S4 B, F, G $5 H, I, J S6 K 3.0 0.7,0.7,0.9 0.7,0.3, 1.2 2.4 a. What is the maximum hourly output rate from this line? (Hint. The line can only go as fast as its slowest workstation.) The maximum hourly output rate is calculators per hour. (Enter your response as an integer)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started