Question
Costa Associates is a construction engineering firm that prepares detailed construction drawings for single-family homes. The market for this service is very competitive. To compete
Costa Associates is a construction engineering firm that prepares detailed construction drawings for single-family homes. The market for this service is very competitive. To compete successfully Costa must deliver quality service at low cost. Costa presents the following data for 2016 and 2017. Engineering labor-hour costs are variable costs. Engineering support costs for each year depend on the engineering support capacity that Costa chooses to maintain each year (that is, the number of jobs it can do each year). Engineering support costs do not vary with the actual number of jobs done in a year.
2016 2017
1. Number of jobs billed 300. 550
2. Selling price per job $2,900 $2,700
3. Engineering labor-hours 21,000 29,000
4. Cost per engineering labor-hour $30 $31
5. Engineering support capacity (number of jobs the firm can do) 700 700
6. Total cost of engineering support (space rent, equipment, etc.). $224,000. $252,000
7. Engineering support-capacity cost per job (row 6 row 5) $320 $360
1. | Calculate the operating income of Costa Associates in 2016 and 2017. |
2. | Calculate the growth, price-recovery, and productivity components that explain the change in operating income from 2016 to 2017. |
3. | Comment on your answer in requirement 2. What do these componentsindicate? |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started