Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

could you please help me in this matter ive gotten stuck multiple times with how to fill in this sheet Marek Company specializes in manufacturing

could you please help me in this matter ive gotten stuck multiple times with how to fill in this sheetimage text in transcribedimage text in transcribed

Marek Company specializes in manufacturing a unique model of bicycle helmet. The model is well accepted by consumers, and the company has the capacity to produce up to 12,000 helmets Marek's budgeted costs for 10,000 helmets are as follows (V = variable): Rent on factory equipment Insurance on factory building Raw materials (plastic) Utility costs for the factory S 6,000 1,500 70,000V 900 V 46,000 V 1.100V Supplies for general office 300 Wages for assembly line workers De preciation on office equipment Misc. materials (oil, solder, fasteners Factory manager's salary Property taxes on factory building Advertising for helmets Sales commissions 800 5,700 400 11,000 7.000 V Depreciation on factory building 1.500 Standard cost data for one helmet is as follows: Direct material: Direct labor: 7 lbs. of plastic $1.00/1b. 5 hrs.@$9.20/hr. INSTRUCTIONS (Can be done either alone or in groups of 2 or 3): a) Classify the costs as follows: DM. DL, MO, Period. Total the dollar amounts in b) Compute the predetermined overhead rate, using direct labor hours as the activity c) Prepare a condensed Flexible Budget assuming that 8,000, 9,000, 10,000 and d) Prepare a condensed Flexible Budget Report. (See p. 1117, 11. 24-16.) Nine each column. (See p. 719, Ill. 15-4. Use S amounts, not Xs) base. (See p. 1069, Il1. 23-10.) 11,000 helmets are produced. Include the following four line items: Direct material, Direct labor, Variable MO, Fixed MO. (See p. 1115, Il1. 24-13.) thousand (9,000) helmets are produced. Actual usage and spending is as follows: Direct material Direct labor Variable MO Fixed MO 62,000 lbs. $1.10/1b 4,600 hrs. @ $9.10/hr $2.000 $15,000 e) Compute and label 1) the quantity and price variances for direct material and direct labor, and 2) the total overhead variance. (See Ch. 25.) Check figures: Predetermined OH rate is $3.42/direct labor hour. In part d), the total budget amount is $121,300

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Cost Accounting

Authors: Don R. Hansen, Maryanne Mowen, Liming Guan, Mowen/Hansen

1st International Edition

0538749636, 978-0538749633

More Books

Students also viewed these Accounting questions