Question
Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed: Direct materials, 3 pounds @
Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed: Direct materials, 3 pounds @ $0.75 per pound. Direct labor, 0.4 hours @ $12.00 per hour. Variable factory overhead, 0.4 hours @ $4.00 per hour. Fixed factory overhead, 0.4 hours @ $10.00 per hour. Manufacturing overhead is assigned to core tests on the basis of direct labor hours. Budgeted fixed manufacturing overhead for the period was $8,000. The denominator activity used for determining the overhead rates was 2,000 core tests or 800 direct labor hours. On March 1 no direct materials (sand) were on hand. The following events occurred during March: 8,600 pounds of sand were purchased at a cost of $7,310. 7,200 pounds of sand were used for core tests. 840 actual direct labor hours were worked at a cost of $8,610. Actual variable manufacturing overhead incurred was $3,200. Actual fixed manufacturing overhead incurred was $8,100. The company actually performed 2,000 core tests during the month.
The variable overhead rate variance for March is: A) $320 unfavorable. B) $320 favorable. C) $160 unfavorable. D) $160 favorable.
The variable overhead efficiency variance for March is: A) $320 unfavorable. B) $320 favorable. C) $160 unfavorable. D) $160 favorable.
I know the answer for the first question is D. 160 unfavorable and the answer to the second one is C.160 unfavorable but I need to know how to get to those answers. Please explain step by step the formula you use and how you got the numbers you used in the formula.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started