Question
Create an Earned Value Management System (EVMS) for a project using the following info below: A. Choose a project in an organization B. Develop a
Create an Earned Value Management System (EVMS) for a project using the following info below:
A. Choose a project in an organization
B. Develop a Scope statement for the project and lost major requirements.
C. Develop a Work Breakdown Structure (WBS) to a minimum of 3 levels in graphic or tabular form and numbered.
D. List the organizational elements (OBS) from where the resources will be drawn.
E. Build a Responsibility Assignment Matrix and identify control accounts.
F. Construct a bar chart showing the Master Schedhle (control accounts) for the project.
G. Lay out a time-phased control account plan for 3 of the control accounts and their work packages.
H. Selected an Earned Value Method for each listed work package.
I. Calculate earned value for any activity that has already occurred.
J. Calculate, if possible, the CPIc, SPIc, TCPI, and three EACs using the formula: EAC = AC + (BAC-EV) / PF
K. Prepare, if possible, a Variance Analysis Report for one control account.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started