Currently there are 85 parts on hand and 20 of it must be considered as safety stock. The lot-sizing rule is fixed order period using
Currently there are 85 parts on hand and 20 of it must be considered as safety stock. The lot-sizing rule is fixed order period using two periods. Lead time is three periods. Determine the planned order release schedule for the gear. (25 Points) Considering the previous problem, suppose each Gear requires three pinions. Currently there are 130 pinions at hand and a scheduled receipt of 50 arrives at time 6. the lot-sizing rule is lot-for-Iot, and the lead time is one period. Determine the gross requirements and then the planned order release schedule for pinions. (25 Points)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started