Question
Daddy Cool Construction has recently been awarded a contract to build a new six storey office building that includes three levels of underground parking. As
Daddy Cool Construction has recently been awarded a contract to build a new six storey office building that includes three levels of underground parking. As part of this contract, you are responsible for preparing a plan showing the proposed site layout.
The attached sketch shows the proposed site and the location of the building footprint.
The structure is comprised of a combination of cast-in-place concrete and structural steel construction. The main walls and floor slab are reinforced concrete with the balance of the structure comprised of structural steel and metal decking. All decking will be covered with a concrete topping. All interior walls are steel stud framing with drywall finishes.
The North and East sides of the facility are in relatively close proximity to existing roads and sidewalks that must remain functional. The excavation will be approximately 25 feet in depth.
During your concrete pour, you intend to use a boom pump whenever possible, but the majority of your planning will be done with the tower crane using a 1 yard concrete bucket. The bucket weighs 6,000 pounds when fully loaded. In late stages of construction, various sub-contractors also require use of the crane for loading and moving materials around the site. You plan to mobilize a tower crane (only one tower crane) with a L4 jib and a two-part line.
The general conditions and nature of the job requires you to mobilize the following items:
- A temporary field office (10' x 40')
- First aid facility and meeting room (10' x 40') Owner designated field office (10' x 40') Storage compound (25' x 30')
- Four site offices for major sub-contractors (each 10' x 40')
Prepare a plan showing the construction site layout. Indicate all the necessary temporary requirements and provisions you may need including, but not limited to, the following:
- Temporary site offices
- Location of the tower crane (one only) & indicate reach at 6,000 lb
- Main access and intended traffic
- Hoarding and protection
- Shoring
- Any other necessary temporary facilities you can think of (you will need to refer to your lecture notes for other temporary requirements)
(Note: please write down any assumptions that you are making. Ex. What assumptions are you making for the location of your tower crane and what are you intending to do for the areas that cannot be reached with your tower crane?)
- Layout your plan on a piece of 11" 17" paper at a scale of 1:500 (or you can plot this using any computer software you like but it must be to a scale of 1:500). You can get the dimensions for the site and footprint of the building by using a metric scale measuring from the attached plan, which is drawn at a scale of 1:1000
- Use the data in the Crane Reach Table to determine the maximum reach of the crane at 6,000 lb and show the maximum reach on your site layout. Hint: You can use the method of interpolation to determine the maximum reach of the crane from the values in the table. In another word, you can assume Hook Reach and Lifting Capacities are in a linear relationship!
- Neatly sketch your temporary facilities s well as the final footprint of the building.
- Use the data in the Crane Reach Table to determine the maximum reach of the crane at 6,000 lb and show the maximum reach on your site layout. Hint: You can use the method of interpolation to determine the maximum reach of the crane from the values in the table. In another word, you can assume Hook Reach and Lifting Capacities are in a linear relationship!
- Neatly sketch your temporary facilities s well as the final footprint of the building.
Note: The data for the above table is supplied for educational purposes only
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started