DataSpan, Incorporated, automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers

DataSpan, Incorporated, automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations.
Month
1234
Throughput time (days)????
Delivery cycle time (days)????
Manufacturing cycle efficiency (MCE)????
Percentage of on-time deliveries75%70%67%64%
Total sales (units)2,7702,6512,5152,420
Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The following average times have been logged over the last four months:
Average per Month (in days)
1234
Move time per unit0.80.40.50.5
Process time per unit3.93.73.53.3
Wait time per order before start of production16.017.521.022.6
Queue time per unit5.05.96.98.0
Inspection time per unit0.40.60.60.4
Required:
1-a. Compute the throughput time for each month.
1-b. Compute the delivery cycle time for each month.
1-c. Compute the manufacturing cycle efficiency (MCE) for each month.
2. Evaluate the companys performance over the last four months.
3-a. Refer to the move time, process time, and so forth, given for month 4. Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue time during production. Compute the new throughput time and MCE.
3-b. Refer to the move time, process time, and so forth, given for month 4. Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4, except that the company is able to completely eliminate both the queue time during production and the inspection time. Compute the new throughput time and MCE.
image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
6 DataSpon, Incorporated, outomated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production Many adjustment problems have been encountered, including problems relating to performance measurement Alter much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations Month 2 7 2 2 2 7 75 2,770 2 2 2 Throughput time (days) Delivery cycle time (days) Manufacturing cycle efficiency (MCE) Percentage of on-time deliveries Total sales (units) 70% 2,651 67% 2,515 2,420 Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The following average times have been logged over the last four months Move time per unit Process time per unit wait time per order before start of production Queue te per unit Inspection time per unit Average per Month (in days) 1 0.0 8.4 0.5 0.5 3.9 3.7 16.0 17.5 21.022.5 5.0 5.9 6.9 8.0 0.6 0.6 0.6 Required: 1a Compute the throughput time for each month 1-b Compute the delivery cycle time for each month 1. Compute the manufacturing cycle efficiency (MCE) for each month late the company's performance over the last four months for month 4 Acume that in month 5 the move time, process time, and so th Move time per unit Process time per unit Waft time per order before start of production Queue time per unit Inspection time per unit Average per Month (in days) 2 3 4 9.8 8.4 0.5 0.5 3.9 3.7 3.5 3.3 16.0 17.5 21.0 22.6 5.0 5.9 6.9 8. 0.6 0.6 2.4 0.4 Required: 1-a Compute the throughput time for each month. 1-b. Compute the delivery cycle time for each month 1-c Compute the manufacturing cycle efficiency (MCE) for each month, 2. Evaluate the company's performance over the last four months 3-a. Refer to the move time, process time, and so forth, given for month 4 Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue time during production Compute the new throughput time and MCE 3-b. Refer to the move time, process time, and so forth, given for month 4. Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4. except that the company is able to completely eliminde both the queue time during production and the inspection time. Compute the new throughput time and MCE Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 the throughout time for each month. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 eBook 1-a. Compute the throughput time for each month. 1-b. Compute the delivery cycle time for each month. 1-c. Compute the manufacturing cycle efficiency (MCE) for each month. (Round your answers to 1 decimal place.) Print Show less eferences Throughput Time Delivery Cycle Time days days Month 1 Month 2 Month 3 Month 4 days days days days Manufacturing Cycle Efficiency (MCE) % 9 % days days Rou Required 2 > forth are again the same as in month 4, except that the company is able to completely eliminate both the quee time dung production and the inspection time Compute the new throughput time and MCE Complete this question by entering your answers in the tabs below. Block Required 1 Required 2 Required 3 Evaluate the company's performance over the last four months. (Indicate the effect of each trend by selecting "Favorable" or "Unfavorable" or "None" for no effect (t.e, zero variance) erences The Throughput Time measure displays The Delivery cycle time-days measure displays Manufacturing cycle efficiency days measure displays trends trends trends Muu 3-b. Refer to the move time, process time, and so forth, given for month 4 Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4, except that the company is able to completely eliminate both the queue time during production and the inspection time. Compute the new throughout time and MCE Complete this question by entering your answers in the tabs below. Required 2 Required 3 Required 1 ok 3-a. (Month 5) Refer to the move time, process time, and so forth, given for month 4. Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue time during production Compute the new throughput time and MCE. 3-b. (Month 6) Refer to the move time, process time, and so forth, given for month 4. Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4, except that the company is able to completely eliminate both the queue time during production and the inspection time, Compute the new throughput time and MCE. (Round your answers to 1 decimal place.) Show less ences Month 5 days Month days Throughput time Manufacturing cycle eficiency (MCE)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managerial Accounting

Authors: Carl S. Warren, James M. Reeve, Jonathan E. Duchac

10th Edition

B010IKDQZM

More Books

Students also viewed these Accounting questions