Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

DataSpan. Incorporated. automated its plant at the start of the Current year and installed a exible manufacturing system. The company is also evaluating its suppliers

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed
DataSpan. Incorporated. automated its plant at the start of the Current year and installed a exible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered. including problems relating to performance measurement. After much study. the company has decided to use the performance measures below. and it has gathered data relating to these measures for the rst four months of operations. math 1 2 3 4 Throughput time (days) 3 ' P ? Delivery cycle time (days) 3' ? ? '5 Manufacturing cycle efficiency (MCE) ? ? P ? Percentage of tin-time deliveries 75K 73% 78K 67% Total. sales (units) 2338 2230 2116 2636 Management has asked for your help in computing throughput time. delivery cycle time. and MCE. The following average times have been logged over the last four months: Average per Month gin days! 1 2 3 4 Move time per unit 8.8 8.4 8.5 8.5 Process time per unit 3.4 3.2 3.8 2.8 wait time per order before start of production 23.8 25.2 38.8 32.3 Queue time per unit 4.3 5.1 6.8 7.6 Inspection time per unit 8.6 8.9 0.9 0.6 Required: 1a. Compute the throughput time for each month. 1b. Compute the delivery cycle time for each month. 1c. Compute the manufacturing cycle efciency (MCE) for each month. 2. Evaluate the company's performance over the last four months. 3a. Refer to the move time, process time, and so forth, given for month 4. Assume that in month 5 the move time, process time, and so forth, are the same as in month 4. except that through the use of Lean Production the company is able to completeiy eliminate the queue time during production. Compute the new throughput time and NICE. 3D. Refer to the move time. process time. and so forth, given for month 4. Assume in month 6 that the move time, process time, and so forth, are again the same as In month 4. except that the company is able to completely eliminate both the queue time during production and the inspection time. Compute the new throughput time and MCE. Complete this question by entering your answers in the tabs below. Req 1 Req 2 Req 3 1-a. Compute the throughput time for each month. 1-b. Compute the delivery cycle time for each month. 1-c. Compute the manufacturing cycle efficiency (MCE) for each month. (Round your intermediate calculations and final answers to 1 decimal place.) Show lessA Throughput Time Delivery Cycle Time Manufacturing Cycle Efficiency (MCE) Month 1 days days % Month 2 days days % Month 3 days days % Month 4 days days Req 1 Req 2 Req 3 Evaluate the company's performance over the last four months. (Indicate the effect of each trend by selecting "Favorable" or "Unfavorable" or "None" for no effect (i.e., zero variance). The Throughput Time measure displays trends The Delivery cycle time-days measure displays trends Manufacturing cycle efficiency-days measure displays trends Req1 Reqz Req3 3-a. (Month 5) Refer to the move time. process time, and so forth, given for month 4. Assume that In month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the companyr is able to completer eliminate the queue time during production. Compute the new throughput time and MCE. 3-b. (Month 6) Refer to the move time. process time, and so forth, given for month 4. Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4, except that the company is able to completely eliminate both the queue time during production and the inspection time. Compute the newI throughput time and MCE. (Round your intermediate calculations and final answers to 1 decimal plate.) Show less; Throughput time Manufacturing cycle e'iciency (MCE)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Intermediate Accounting Volume 2

Authors: Thomas H. Beechy

5th Edition

0071091319, 978-0071091312

More Books

Students also viewed these Accounting questions