Question
DeFleur manufactures bicycles. The bicycles are manufactured in two divisions. In the framing division, the carbon bicycle frames are manufactured. In the assembly division, the
DeFleur manufactures bicycles. The bicycles are manufactured in two divisions. In the framing division, the carbon bicycle frames are manufactured. In the assembly division, the components are assembled to the frame and the bike is ready for sale. There is no market for the unassembled frames and all manufactured frames are transferred to the assembly division. For the purposes of performance evaluation, the framing division transfers the completed frames to the assembly division at the budgeted standard cost of a frame. The budgeted units of production for the framing division is 1,000, all of which will be transferred to the assembly division at the standard full absorption cost.
The budgeted costs for the framing division are as follows:
Direct Materials per unit: 10 layers of carbon-fiber at $20/layer | $200.00 |
Direct Labor per unit: 8 hours at $12/hour | $96.00 |
1. Standard variable overhead is applied to products on the basis of direct labor hours at a rate of $4/unit produced.
Budgeted Fixed Overhead is $30,000 and the standard fixed cost per unit is based on the budgeted units of production (Hint: Calculate the Standard FOH/unit).
Actual data for the period relating to the costs are as follows:
The actual number of units produced was | 800 |
Actual Fixed Overhead costs were | $30,000 |
Actual Variable Overhead costs | $4,000 |
2. The framing division worked 7,500 direct labor hours during the year at a total cost of $93,750.
3. A total of 9,000 carbon-fiber layers were purchased and used in production during the year at a total cost of $171,000.
4. Total Budgeted cost for the framing division was $330,000. The total actual cost was $298,750.
Q1. What is the actual cost per unit produced?
Q2. What is the transfer price per frame? (Remember that the transfer price is the standard cost per unit.)
Q3. What is the primary (largest) cause of the difference between actual cost per unit produced in the framing department and the transfer price per frame?
Group of answer choices
Volume Variance
Efficiency Variance
Price Variance
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started